01072015144724 · MCU10/2065
Attached to the e-mail MCU10/2065.01 Request to Extend the Development Approval 17 Grant St Noosa Heads.
MCU10/2065 39. Submission of written certification from a suitably qualified person confirming that the noise levels from all mechanical equipment comply when measured at either the residential boundary or outside the most exposed part of an.affected building, whichever is the closest to the equipment. 40. The assessment and certification is required immediately after installation of the - equipment and prior to any occupation of the building, and in a format approved by. _ Council. All equipment should be operating at the same time to test the overall noise level created. 41. Advice: It is highly recommended that the person you engage to certify the installation is involved at the plan development stage so they can-recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems. it is a lot more costly to try and deal with noise problems after everything is built. 42. Noise from residential building works shall comply with the following - 42.1. Limited to between 7:00am to 6:30pm Monday to Saturday. 42.2. All reasonable measures are taken to minimise noise emissions. 42.3. Not permitted on Sunday or public holidays. UNITYWATER ‘ 43. The fire-fighting demand on Unitywater’s water supply system from the development must not exceed 165 litres per second 44, Separate 25mm PE water services must be installed to a common lot boundary with independent. meters: installed outside the boundary of the lot in accordance with Unitywater Standard Drawing SCW 361 45. Water meters must be located on alternative boundaries to electrical pillars 46. Buildings and other structures must maintain a minimum clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection openings 47, The storm water retention system must be located a minimum of 1. 5 metres from Unitywater sewerage infrastructure 48. Stormwater pipes greater than 225mm diameter must maintain a minimum clearance of 1.0 metre from Unitywater sewerage infrastructure 49. The level of the existing sewer manholes must be adjusted to suit the proposed : finished surface levels. Work must be undertaken by Unitywater at the applicants cost ..§0.--Tree--plantings.must.maintain..a.minimum.horizontal..clearance..of 1.0 metre. from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature and suitable approved varieties 51. Construction works undertaken in the vicinity of Unitywater water supply or sewerage : infrastructure must not adversely affect: thé integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met. by the - applicant L& Not Applicable [:6. "APPR NS/DOCUMENTS . The approved plans and / or documents for this development approval are listed in the. following tables: PD-DA-FM384/1-13/04/2010 SO, : Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
01072015144724.pdfRelated documentApplication case desk ↗
01072015144724.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.