MCU24/0151 Development Application For Material Change Of Use For Outdoor Sport & Recreation (Rowing Club) At Lake Macdonald Drive, Lake Macdonald · Attachment 1 - (MCU24/0151) - Proposed Conditions
PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT 8 APRIL 2025
Site Access and Driveways
12. An access driveway must be provided from Hoy Road to all parking and manoeuvring areas
of the development. The works must be undertaken generally in accordance with Bennett +
Bennett’s Site Plan (241495_001_PRO) dated 28 October 2024 and include a driveway
crossover generally in accordance with Council’s standard drawing RS-056.
Car Parking
13. A minimum of 9 car parking spaces must be provided on the site. The works must be
generally in accordance with Bennett + Bennett’s Site Plan (241495_001_PRO) dated 28
October 2024 and must include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Stormwater Drainage
14. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Easements
15. Unless otherwise agreed in writing by the relevant service provider, any public or third-party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
16. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
17. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
18. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be contained entirely within the subject site unless
written permission form the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
19. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Sunset Clause for Approval
20. This development approval lapses on 17 April 2032. The approved use must cease operating
by this date and all structures, hardstand areas, fencing removed within 60 days of the
cessation of operations, with the site rehabilitated by:
a. Removing all weed species, including declared plants under the Biosecurity Act 2014
and sub-ordinate Regulation 2003 and the Noosa Local Government Area Pest
Management Plan 2015-2019.