    Please find enclosed the documents regarding the following information reguest:


        1. PLANNING
    Issue - Landscaping
    "The proposal is deficient in total landscaping for the site with the southern boundary void of
    any landscaping."

    Our response:
    As part of the information package, we provide an amended ground floor plan from the
    architect that indicates:
            an additional garden bed with a minimum of O.50m wide along the southern boundary;
            adjusted driveway as per pt. 2

    Additional garden bed: We note that the available space along the southern boundary is
    limited and that the calculation of site cover and landscaping of the proposed project is in
    accordance with The Noosa Plan; however, we agree to provide an additional garden bed
    with 500mm width (see revised ground floor plan (level 1), attached.


         2. ENGINEERING" DRIVEWAY
    Issue" Driveway
    "Council has concerns with:
    1. the proposed access driveway in regard to the apparent extent of excavation within
    the road reserve,
    2. the grades of the access driveway and
    3. the ability for vehicles to manoeuvre and exit the site in a forward gear."

    Our response:
    As part of the information package, we provide a set of drawings from SCG Engineers that
    illustrate the driveway as per request.
    The scale, location and layout of the driveway have been investigated in detail and are now
    sufficient for vehicles to exit in forward gear and grades are appropriate.


         3. ENGINEERING - STORMWATER
    Issue - Stormwater
    "The submitted site plan indicates a "water tank" but no other detail in regard to stormwater
    collection/disposal has been provided."

    Our response:
    As part of the information package, we provide the Stormwater Management Plan from SCG
    Engineers that give all required information.

    Please also note the comment "Permeable Paving" in the vehicle manoeuvring area.


        4. ENGINEERING" EXCAVATION
    Issue - Excavation
    "There is significant excavation works required to construct the development. Due to the
    sites natural soils and the close proximity of adjoining buildings, Council has concerns with
    the potential for adverse effects on the adjoining properties."


                                                                                                      2

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_006 - Response to Information Request.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.