Council archive · source document
Decision Notice - Approved by Delegation of Authority - RAL26 0015 (As Published) · RAL26/0015
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 9 September 2030,
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
LAK08_ECA B Reconfiguration of Lot 434 Lake Cooroibah Road July 2026
Sheet 1 of 1 Cooroibah Lot 78 SP116879, prepared by Pivotal
Perspective
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Plan of Development
5. All future dwellings and wastewater treatment systems on the approved Lot 7 must be sited
and constructed in accordance with the approved building envelopes shown on the Approved
Plans. A copy of the approved Plan of Development must be included in the contract of sale
for the approved lots, together with a clause which requires future dwellings to be constructed
in accordance with it.
6. The applicant must prepare a metes and bounds building envelopes plan indicating House
site areas and effluent disposal areas for the proposed lots. The areas must be in accordance
with the approved plan titled Reconfiguration of Lot 434 Lake Cooroibah Road, Cooroibah
Lot 78 SP116879 prepared by Pivotal Perspective and dated July 2026. The plans must be
submitted in both hardcopy and digital format (dwg) on GDA 94 zone 56 coordinates. The
applicant must submit the plans to Council for approval prior to the endorsement of the Plan
of Survey.
Boundary Encroachments
7. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice;
b. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement;
c. all utility services and connections (e.g. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement;
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements;
e. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot;
f. all retaining walls and structures are fully contained within the lot they retain;
g. any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties; and
h. for the community title scheme, the road pavement changes required by this Decision
Notice accurately demarcate the boundaries of the public and private land.
Page 2 of 7
Document Set ID: 25151680
Version: 3, Version Date: 09/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - RAL26 0015 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 157 KB (small file)
- File type
No other editions are linked here.