Decision Notice - Approved by Delegation of Authority - RAL26 0015 (As Published) · RAL26/0015
ENVIRONMENTAL
Land Rehabilitation
8. Prior to Plan Seal, a report must be submitted to Council from a qualified person* which
certifies that the development has been constructed in accordance with the Approved
Rehabilitation Management Plan and Land Rehabilitation conditions of this Decision Notice.
9. The land area identified for rehabilitation must be rehabilitated by a suitably qualified person,*
in accordance with the Approved Rehabilitation Management Plan listed with this Decision
Notice.
*(Refer to Advisory Note)
Bushfire Management – Reconfiguration Requirements
10. A clause must be included in the contract of sale for Lot 7 which requires future dwellings to
be constructed within the building envelopes shown on the Approved Plans listed within this
Decision Notice.
11. A copy of the Bushfire Hazard Assessment and Management Plan listed within this Decision
Notice must be provided to the nearest fire authority.
12. Prior to Plan Seal, certification must be submitted to Council from a qualified person* which
certifies that the development has been constructed in accordance with the bushfire
management conditions of this Decision Notice.
Bushfire Management – Future Dwelling Requirements
13. All future dwellings on the approved Lot 7 must be sited within the building envelopes shown
on the Approved Plans.
14. All future dwellings on the approved Lot 7 must be sited and/or constructed in accordance
with section 6 of the Bushfire Hazard Assessment and Management Plan listed within this
Decision Notice.
ENGINEERING
Property Access and Driveways
15. A residential driveway must be constructed off the existing access handle to service
proposed Lot 7.
16. Vehicle access to Lot 7 & 8 is limited to the constructed driveway only. A clause must be
included in the contract of sale for Lots 7 & 8 which requires vehicle access to be from the
constructed driveway only, and which prohibits the driveway from being relocated without
Council agreement.
Stormwater Drainage
17. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Services
18. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
19. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
20. Certification must be submitted to Council from all relevant service providers (Energex and
NBN) which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Page 3 of 7
Document Set ID: 25151680
Version: 3, Version Date: 09/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - RAL26 0015 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 157 KB (small file)
- File type
No other editions are linked here.