L2NC - Information Request Response

of 4

Page text shows just the words. Original shows the document exactly as it was published.

   24 February 2021

   Our Reference: 513
   Council File Reference: MCU20/0127 & OPW20/0211

   Noosa Council
   BY EMAIL TRANSMISSION
   [email protected]

   Attention: Patrick Murphy

   Dear Patrick,

   RE:        RESPONSE TO INFORMATION REQUEST – MCU20/0127 & OPW20/0211
              on land at 11 Leo Alley Road, Noosaville, QLD, 4566 (legally described as Lot 252 on
              SP104257)

   I refer to Council’s Information Request dated 16 December 2020 issued in respect of the above
   application. Each of Council’s request items have been set out and responded to below. The following
   supporting information is enclosed with this response.

              Attachment 1   Updated Proposal Plans prepared by Blackburne Jackson
              Attachment 2   Updated Engineering OPW Plans prepared by Covey Associates Pty Ltd
              Attachment 3   Updated Landscape OPW Plans prepared by Covey Associates Pty Ltd
              Attachment 4   Update Stormwater Management Plan prepared by Covey Associates
                             Pty Ltd
              Attachment 5   Unitywater CAR Response
              Attachment 6   Technical Note prepared by Tectonic Geotechnical and Environmental
                             Engineers
              Attachment 7   Product Information – Fox DD600 System
              Attachment 8   Energex Network Connection Contract

   Item 1 – Provide additional detail on the driveway and access to the proposed development. The detail
   must be prepared by a suitably qualified person; be generally in accordance with Council’s standard
   drawing RS-051 and respective addendum; and include but not be limited to:
      1.1. levels and grades of the access driveway;
      1.2. a longitudinal section extending from the centreline of the formation in Leo Alley Dr to the
            proposed development.

   Response – As requested by Council updated Engineering OPW Plans are included at Attachment 2.
   These plans have been amended to include level and grade detail on Drawing no. 192297-C001 and
   the extension of the driveway longitudinal section on Drawing no. 192297-C300.



                                                                                                    P: 07 5452 5207
                                                                                           E: [email protected]
                                                                              45 First Avenue, Mooloolaba Qld 4557
                                                                                 PO Box 1043 Maroochydore Q 4558
Page 1 of 4                                                                     innovativeplanningsolutions.com.au
Log in to download the original file

L2NC - Information Request Response.pdf · 227 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

   Item 2 – Provide a construction method plan for these retaining structures that does not contemplate
   the use of vibration equipment (either for sheet pilling or soil compaction).

   Response – Per Drawing no. 192297-C001 within the updated Engineering OPW Plans included at
   Attachment 2, the retaining walls will no longer utilise sheet pilling and as such vibration equipment
   will not be required. It is noted the retaining wall on the western boundary is now proposed to use a
   block masonry type wall which will be constructed incrementally along the boundary in order to avoid
   any nuisance to the adjacent property. Further wall detail is included within the Technical Note
   prepared by Tectonic dated 4 February 2021 which is included in Attachment 6.

   Item 3 – Ensure that no structural elements, whether temporary or permanent, extend into
   neighbouring properties. Alternatively, provide neighbouring properties owners’ written consent,
   allowing to do so.

   Response – The updated Engineering OPW Plans included at Attachment 2 and updated Landscape
   OPW Plans included at Attachment 3 confirm that no structural elements extend into neighbouring
   property and are wholly contained within the subject site.

   Item 4 – Provide Unity Water’s approval for the proposed works over and adjacent to the sewer line.

   Response – As requested by Council, Unity Water’s Concurrence Agency Referral Response including
   conditions for the proposed works over and adjacent to the sewer is included at Attachment 5.

   Item 5 – Provide amended plans detailing, but not limited to, the following information:
      5.1 proposed retaining structure (material foundations, etc.), ensuring that no works are
           undertaken on the neighbouring property;
      5.2 a section plan indicating the location of the walls and foundations in relation to the property
           boundary and finished floor levels;
      5.3 the structures required to collect and convey existing overland flows that are impacted on by
           the construction of the retaining structure;
      5.4 any fencing to be installed on top of or beside the retaining structure;
      5.5 the location of any services, above or below ground, adjacent to the proposed retaining
           structure.

   Response – As request the updated Engineering OPW Plans included at Attachment 2 have been
   amended accordingly to reflect the detail of the proposed retaining wall along the site’s western
   boundary per Drawing no. 192297-C120. It is noted the existing neighbouring retaining wall at the
   north-western corner of the site will remain per Drawing no. 192297-C100 and the proposed building
   wall will be used for retaining. As detailed by the updated Stormwater Management Plan included at
   Attachment 4 there is no existing overland flow in this location and as previously confirmed no works
   will be undertaken on the neighbouring property. The existing fence in this location will also remain.
   Any relevant services have been included into the amended plan set.


                                                                                                     P: 07 5452 5207
                                                                                            E: [email protected]
                                                                               45 First Avenue, Mooloolaba Qld 4557
                                                                                  PO Box 1043 Maroochydore Q 4558
Page 2 of 4                                                                      innovativeplanningsolutions.com.au

Page 3

   Item 6 – Provide an amended plan, prepared by a RPEQ, detailing the full travel path of a MRV entering
   and leaving the proposed development, confirming that there are no clashes with the proposed
   buildings, car spaces, etc.

   Response – As requested by Council the updated Engineering OPW Plans included at Attachment 2
   have been amended accordingly to include a swept path analysis for the full travel path of an MRV as
   shown on Drawing no. 192297-C900.

   Item 7 – Provide a plan showing how stormwater will not enter this area, including details of sewer
   connection.

   Response – As detailed on Drawing no. 192297-C001 included within the updated Engineering OPW
   Plans at Attachment 2 surface levels of the bin wash area are now included. The development
   proposes to utilise a Fox Diversion System which discharges to stormwater during a rain event and
   discharges to sewer during a bin wash down operation. A product information sheet for the Fox DD600
   System is included at Attachment 7. Furthermore, as an additional precaution the area draining to the
   Fox DD600 will only incorporate the bin wash area.

   Item 8 – Update sections which involve bioretention and retaining walls to include either Solution 1 or
   Solution 2 details from Figure 33 of the Bioretention Technical Design Guidelines (Water by Design,
   2012). The new design has only 350mm level difference between the bioretention overflow pit crest
   and the adjacent building FFL and only 250mm level difference to TOW. Clarify what are the water
   levels in the bioretention basin for the 1%AEP event under design blockage conditions and under severe
   blockage and demonstrate that adequate freeboard to the building FFL is achieved in the design case
   and no building inundation occurs in the severe case.

   Response – The updated Engineering OPW Plans included at Attachment 2 have been amended to
   reflect stormwater detail sections which incorporates a solution to avoid short-circuiting of the
   bioretention basin, refer to Drawing no. 192297-C300. The levels of the basin and overflow have been
   adjusted to ensure adequate freeboard to adjacent buildings is achieved and the weir overflow
   capacity of the bioretention basin calculations determined to be acceptable.

   Item 9 – Plans which clearly demonstrate the provision of the minimum number of motorcycle and
   bicycle parking spaces.

   Response – The updated Proposal Plans included at Attachment 1 have been amended accordingly to
   reflect the required onsite minimum number of motorcycle and bicycle parking spaces. The proposal
   now provides for eight (8) motorbike spaces and nine (9) bicycle spaces throughout the development
   layout.

   Item 10 – Details of locker and shower facilities in compliance with the code.



                                                                                                      P: 07 5452 5207
                                                                                             E: [email protected]
                                                                                45 First Avenue, Mooloolaba Qld 4557
                                                                                   PO Box 1043 Maroochydore Q 4558
Page 3 of 4                                                                       innovativeplanningsolutions.com.au

Page 4

   Response – The updated Proposal Plans included at Attachment 1 have been amended to incorporate
   Drawing no. 3137 – DA14 which details the internal configuration and facilities included within the
   Amenities Building which has been designed in accordance with the Council code requirements.

   Item 11 – Elevation plans to detail the colours and materials of all surfaces which comply with
   Performance Outcome PO11 and the associated Acceptable Outcomes.

   Response – Drawing no. 3137-DA06 within the updated Proposal Plans at Attachment 1 has been
   amended to include a detailed legend relating to the proposed materials and finishes to be utilised
   throughout the development. The proposed materials and finishes reflect a modern neutral palette
   and achieves a high-quality visual outcome for built form on the site.

   Item 12 – Clarification as to whether a pad mount transformer is required.

   Response – A pad mount transformer has been confirmed by Energex as not being required for the
   proposed development, as indicated by the Network Connection Contract provided by Energex
   included at Attachment 8 which omits reference to a pad mount transformer.

   Item 13 – If a pad mount transformer is required amended plans which provide for additional planting
   to offset the area required for the pad mount.

   Response – Refer to response provided to Item 12 above.

   Summary

   This response is considered to constitute a full response to Council’s Information Request and we
   therefore request that Council proceed with its assessment of the application.

   Should you have any further queries or wish to discuss anything further, please do not hesitate to
   contact Senior Town Planner – Ella King on 07 5452 5207.

   Yours sincerely




   James Brownsworth
   DIRECTOR
   INNOVATIVE PLANNING SOLUTIONS




                                                                                                      P: 07 5452 5207
                                                                                             E: [email protected]
                                                                                45 First Avenue, Mooloolaba Qld 4557
                                                                                   PO Box 1043 Maroochydore Q 4558
Page 4 of 4                                                                       innovativeplanningsolutions.com.au

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.