L2NC - Information Request Response
Item 2 – Provide a construction method plan for these retaining structures that does not contemplate
the use of vibration equipment (either for sheet pilling or soil compaction).
Response – Per Drawing no. 192297-C001 within the updated Engineering OPW Plans included at
Attachment 2, the retaining walls will no longer utilise sheet pilling and as such vibration equipment
will not be required. It is noted the retaining wall on the western boundary is now proposed to use a
block masonry type wall which will be constructed incrementally along the boundary in order to avoid
any nuisance to the adjacent property. Further wall detail is included within the Technical Note
prepared by Tectonic dated 4 February 2021 which is included in Attachment 6.
Item 3 – Ensure that no structural elements, whether temporary or permanent, extend into
neighbouring properties. Alternatively, provide neighbouring properties owners’ written consent,
allowing to do so.
Response – The updated Engineering OPW Plans included at Attachment 2 and updated Landscape
OPW Plans included at Attachment 3 confirm that no structural elements extend into neighbouring
property and are wholly contained within the subject site.
Item 4 – Provide Unity Water’s approval for the proposed works over and adjacent to the sewer line.
Response – As requested by Council, Unity Water’s Concurrence Agency Referral Response including
conditions for the proposed works over and adjacent to the sewer is included at Attachment 5.
Item 5 – Provide amended plans detailing, but not limited to, the following information:
5.1 proposed retaining structure (material foundations, etc.), ensuring that no works are
undertaken on the neighbouring property;
5.2 a section plan indicating the location of the walls and foundations in relation to the property
boundary and finished floor levels;
5.3 the structures required to collect and convey existing overland flows that are impacted on by
the construction of the retaining structure;
5.4 any fencing to be installed on top of or beside the retaining structure;
5.5 the location of any services, above or below ground, adjacent to the proposed retaining
structure.
Response – As request the updated Engineering OPW Plans included at Attachment 2 have been
amended accordingly to reflect the detail of the proposed retaining wall along the site’s western
boundary per Drawing no. 192297-C120. It is noted the existing neighbouring retaining wall at the
north-western corner of the site will remain per Drawing no. 192297-C100 and the proposed building
wall will be used for retaining. As detailed by the updated Stormwater Management Plan included at
Attachment 4 there is no existing overland flow in this location and as previously confirmed no works
will be undertaken on the neighbouring property. The existing fence in this location will also remain.
Any relevant services have been included into the amended plan set.
P: 07 5452 5207
E: [email protected]
45 First Avenue, Mooloolaba Qld 4557
PO Box 1043 Maroochydore Q 4558
Page 2 of 4 innovativeplanningsolutions.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.