L2NC - Information Request Response
Item 6 – Provide an amended plan, prepared by a RPEQ, detailing the full travel path of a MRV entering
and leaving the proposed development, confirming that there are no clashes with the proposed
buildings, car spaces, etc.
Response – As requested by Council the updated Engineering OPW Plans included at Attachment 2
have been amended accordingly to include a swept path analysis for the full travel path of an MRV as
shown on Drawing no. 192297-C900.
Item 7 – Provide a plan showing how stormwater will not enter this area, including details of sewer
connection.
Response – As detailed on Drawing no. 192297-C001 included within the updated Engineering OPW
Plans at Attachment 2 surface levels of the bin wash area are now included. The development
proposes to utilise a Fox Diversion System which discharges to stormwater during a rain event and
discharges to sewer during a bin wash down operation. A product information sheet for the Fox DD600
System is included at Attachment 7. Furthermore, as an additional precaution the area draining to the
Fox DD600 will only incorporate the bin wash area.
Item 8 – Update sections which involve bioretention and retaining walls to include either Solution 1 or
Solution 2 details from Figure 33 of the Bioretention Technical Design Guidelines (Water by Design,
2012). The new design has only 350mm level difference between the bioretention overflow pit crest
and the adjacent building FFL and only 250mm level difference to TOW. Clarify what are the water
levels in the bioretention basin for the 1%AEP event under design blockage conditions and under severe
blockage and demonstrate that adequate freeboard to the building FFL is achieved in the design case
and no building inundation occurs in the severe case.
Response – The updated Engineering OPW Plans included at Attachment 2 have been amended to
reflect stormwater detail sections which incorporates a solution to avoid short-circuiting of the
bioretention basin, refer to Drawing no. 192297-C300. The levels of the basin and overflow have been
adjusted to ensure adequate freeboard to adjacent buildings is achieved and the weir overflow
capacity of the bioretention basin calculations determined to be acceptable.
Item 9 – Plans which clearly demonstrate the provision of the minimum number of motorcycle and
bicycle parking spaces.
Response – The updated Proposal Plans included at Attachment 1 have been amended accordingly to
reflect the required onsite minimum number of motorcycle and bicycle parking spaces. The proposal
now provides for eight (8) motorbike spaces and nine (9) bicycle spaces throughout the development
layout.
Item 10 – Details of locker and shower facilities in compliance with the code.
P: 07 5452 5207
E: [email protected]
45 First Avenue, Mooloolaba Qld 4557
PO Box 1043 Maroochydore Q 4558
Page 3 of 4 innovativeplanningsolutions.com.au