RFI DTMR memorandom response
Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.
30f3 There are various kinks in lanes and narrowing of the lane width. These errors in geometry and cross section need to be resolved. Geometry has been corrected There is currently a high-entry angle for left turner from Lamonts Road. As per Austroads Part 41, Clause 6.2.3 change the alignment of Lamonts Road as it approaches Cooroy Connection Road to ensure the observation angle is between 700 - 900. The centreline of Lamonts road has been shifted north to bring the curve further back from Elm street. This gives extra length for the design vehicle to turn perpendicular with Elm street at the stop line. Why is there a reduction in shoulder width as a vehicle turns left from Lamonts Road? Maintain shoulder width through the intersection. Shoulder width has been maintained for the entire length. Provide more detail for the power pole behind guardrail. Is there adequate room behind guardrail to allow for the deflection of guardrail in the event of an accident? It is likely to be more cost effective to remove the gap between the two sections of guardrail (compared to providing two additional end treatments). The geometry of the CHR turn in to Lamonts road has been modified such that the northbound lane is now a straight through and the lateral movement has been shifted to the turn and southbound lanes. Should this be found to be acceptable it will remove any conflicts with the existing power poles on the western side of Elm Street. Refer drawing RF01. Line marking is incorrect across Lamonts Road. Refer drawing RFO1 for amended linemarking. How has storage length been determined for right turn into Lamonts Road? Storage length for CHR into Lamonts road has been designed as 15m which allows for one 12.5m MRV design vehicle. Should you require any further information please do not hesitate to contact the undersigned. Yours sincerely Calibre Consulting Rob Blake Manager - Urban Development ATTACHMENTS 4. Revised Drawings as per Document Transmittal COPIES 4, Palm Lake Works Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.