Original source · versioned page text
Noosa Plan Submission 17 December 2015 - Final submission table
Attached to the e-mail MCU15/0095 & REC15/0022 PM Submission (1) Object - Jennifer Drysdale.
Plans and drawings: the text below has words only, no drawings.
36. Of major concern is the close proximity between the proposed refuelling area on the
site and the GSLC boundary. For example, it is less than:
30 meters (estimated) from the outdoor toddler pool to the proposed refuelling
area5; and
40 meters (estimated) from the HPE centre to the proposed refuelling area.
Potential health impacts from the site
37. The applicant has not provided any data with respect to proposed potential air toxins
from the site.
38. Air pollutants will arise from the site from multiple sources, including:
(a) emissions generated by increased fossil fuel combustion by motor vehicles
using the service station;
(b) vapour expelled from a vehicle’s petrol tank as the tank is filled;
(c) drips from the filling nozzle;
(d) leaks from hoses and gaskets;
(e) vapour expelled from underground storage tanks as they are refilled by road
tankers;
(f) vapour from the fuel vents; and
(g) potential liquid spillages.
39. Further, potential dangers regarding the site include:
5
The DA on page 28 states; “The service station refuelling area is sufficiently distanced from the school
boundary which is greater than 25m”.
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original