GENERAL COMMITTEE MEETING AGENDA 16 DECEMBER 2019
*Note: The foundations are to be modified to comply with the Core Geotechnical
Consultants report dated, September 2019 (ref J000867-003-R-Rev 0).
Approved Documents
4. Development must be undertaken strictly in accordance with the approved documents
listed in the following table unless otherwise amended by these conditions.
Document
M Design & Fourteen Enterprises Pty Ltd (Appellants v Noosa Shire Council
(Respondent), Planning and Environment Appeal No.245 of 2019, Joint Expert Report
dated 7 August 2019 including all Attachments:
Attachment 1
Working Notes: M Design and Fourteen Enterprises Pty Ltd as trustee v Noosa Shire
Council – 42 Seaview Terrace, Sunshine Beach, prepared by Omtrek dated July
2019; and
Attachment 2
Geotechnical Report, proposed swimming pool 42 Seaview Terrace, Sunshine
Beach, Updated in Response to Joint Information Request by Coastal Engineering
Experts, prepared by Core Consultants Pty Ltd and dated 24 September 2019; and
Attachment 3
Core Consultants email advice of 27 September 2019; and
Attachment 4
Coastal Erosion Historic Assessments by Neil Collins
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the issue of a Development Permit for Building Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
6. The existing trees, in particular the Pandanus tectorius located in the south east corner of
the site must be retained as shown on the approved plan by M Design, Drawing No. 2.1,
Issue C, dated 18 September 2018.
7. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
8. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared; and
d. using low impact construction techniques around vegetation.
Page 28 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.