Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-12-16 General Committee Agenda

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                           16 DECEMBER 2019


      Earthworks
9.    Earthworks required on site must be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
      ponding of water on any adjoining lands or concentrate or direct overland flow on to an
      adjoining property.
      Geotechnical Stability
10.   All works must be carried out strictly in accordance with the geotechnical report prepared
      by Core Consultants Pty Ltd and dated 24 September 2019, including the following
      recommendations (which are the minimum specifications):
      10.1. piles are to be a minimum of 10m deep;
      10.2. pile arrangement number, arrangement and spacing and associated A frame
            structure and capping beams are to be, as a minimum, in accordance with Drawing
            Number P1001 entitled ‘A Frame for Slope Stabilisation General Arrangement’ and in
            accordance with Figure B4 entitled ‘Case 4; Piles Support’;
      10.3. grout columns are to be installed between the micro-piles to a minimum depth of 10m
            to prevent all sand flow between the piles; and
      10.4. a minimum of 56 piles are required with 50 required under the eastern side of the
            pool.
11.   All works associated with the construction of the pool are to be certified by a Registered
      Professional Engineer of Queensland (RPEQ) to ensure compliance with the geotechnical
      report prepared by Core Consultants Pty Ltd and dated 24 September 2019, and the
      conditions of approval.
      Coastal Protection
12.   To protect the coastal dune system, a mix of native endemic coastal vegetation consisting
      of ground covers, shrubs and trees must be planted for a width of 5m for the full length of
      the seaward boundary in accordance with Council’s Planning Scheme Policy PSP3
      Landscaping Plants and Guidelines. The planted vegetation must have a minimum pot
      size of 200mm and must be planted at the following density:
      a.   trees must have a maximum spacing of 5m;
      b.   shrubs must have a maximum spacing of 2m; and
      c.   ground covers planted between the trees and shrub stems to provide a dense
           coverage.
13.   An access gate or like device allowing access to the beachfront area is not permitted to be
      installed.



REPORT
On 20 December 2018, Council, at its Ordinary Meeting, resolved to refuse an application to
change an existing development approval for a house to facilitate the construction of a swimming
pool and an extension to a deck within the state Coastal Building Line at 42 Seaview Terrace,
Sunshine Beach.
The proposed works included 2 new in ground water tanks, approximately 48m2 of decking and a
13.4m x 4.4m swimming pool and a set of stairs seaward of the coastal building line.




                                                                                  Page 29 of 51
Log in to download the original file

2019-12-16 General Committee Agenda(PDF, 4MB).pdf · 4.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.