OPERATIONAL PLAN 2024-25 Q3 QUARTERLY REPORTING (Referred from Services and Organisation Committee Meeting dated 10 June 2025 - Item 8.1) · Attachment 1 - Q3 Operational Plan Update

of 29

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Attachment 1




Noosa Council
2024-25 Operational Plan
Quarterly Progress Report – Q 3 (1 January to 31 March 2025)
Log in to download the original file

Attachment 1 - Q3 Operational Plan Update.pdf · 304 KB (small file)

Full text of the other 28 pages

Page 2

Our Overall Progress for the Quarter:
The Operational Plan comprises 107 initiatives that are strategically aligned with the themes outlined in the Noosa Council Corporate Plan 2023–2028. Each
initiative contributes to Council’s overarching objectives and may represent either a long-term, staged effort aimed at achieving a broader vision—potentially
spanning multiple years—or a discrete project with clearly defined objectives and deliverables.
As of this reporting period, the majority of initiatives are progressing well. A total of 81 initiatives (76%) are either marked as ‘Completed’ or are currently ‘On
Track’ to be completed within the scheduled timeframe. Eighteen initiatives (17%) are experiencing a ‘Minor Disruption’, while 8 initiatives (7%) are facing a ‘Major
Disruption’.
Notably, there has been a marked improvement in the number of completed initiatives compared to the previous quarter, increasing from 7 to 17. While there has
also been a rise in the number of initiatives experiencing disruption—from 19 to 26—this is not unexpected at the mid-point of the operational plan cycle. As
projects reach maturity and move closer to completion, there is typically greater visibility into risks and challenges, which may result in an increase in identified
disruptions. This trend reflects both the natural progression of complex initiatives and Council's commitment to transparent and timely reporting.



         Status                           Environment          Liveability         Prosperity           Future            Excellence            Total
         Complete                               3                   5                  2                   1                   6                 17
         On Track                              15                  17                  7                  12                  13                 64
         Minor Disruption                       1                   4                  3                   3                   7                 18
         Major Disruption                       2                   1                  0                   0                   5                  8
         Total                                 21                  27                  12                 16                  31                 107

Page 3

                  18
                  16
                  14
                  12
                  10
                   8
                   6
                   4
                   2
                   0
                             Environment             Liveability              Prosperity                   Future          Excellence

                                                      Complete     On Track   Minor Disruption   Major Disruption




Comments:
The 2024–25 Operational Plan is both ambitious and comprehensive, incorporating numerous strategic initiatives aimed at advancing Council’s Corporate
Plan goals. However, several factors have affected the timely delivery of certain projects:
   •   Extended Consultation Periods:
       Elevated levels of community interest and participation—particularly in relation to the Noosaville Foreshore Infrastructure Management Plan—have
       resulted in longer-than-anticipated engagement processes. This has had a flow-on effect, delaying other initiatives such as the Destination
       Management Plan and the Noosa River Catchment Management Plan.
   •   Resource Limitations:
       Ongoing resourcing challenges continue to impact the delivery of key programs. Notable examples include delays in the implementation of the Eastern
       Beaches Management Plan and constraints affecting elements of the Capital Works Program. These challenges are not uncommon in local
       government, where finite staffing and budgetary resources must be balanced against an increasingly broad scope of responsibilities, rising community
       expectations, and emerging priorities. As such, trade-offs are often required, and project timelines may be adjusted to reflect available capacity.
   •   Emerging Priorities and External Events:
       The reprioritisation of resources to respond to unforeseen events has also influenced progress. During the reporting period, Council was required to
       divert resources to support preparations for ex-Tropical Cyclone Alfred and respond to significant rainfall events in March 2025. These emergent
       demands have temporarily shifted focus away from planned initiatives, placing additional pressure on operational capacity, particularly on the Capital
       Works Program.

Page 4

   •   Workforce Capacity and Wellbeing:
       The ability to deliver the Operational Plan is closely linked to workforce capability. Council continues to focus on strengthening project management
       practices, improving employee engagement and wellbeing, and enhancing recruitment and retention strategies. These areas remain a priority for the
       Leadership Team to ensure sustainable delivery of strategic and operational outcomes.


Theme 1: Environment – Q 3 Initiatives Progress
Highlights:

   •   Yurol Ringtail State Forest transition to National Park initiative has been completed well ahead of the original schedule. The change from State Forest
       to protected area will result in permanent protection of this important corridor between Tewantin and Cooloola National Parks.
   •   Successful funding received via Resilient Rivers SEQ Program to develop a Catchment Action Management Plan for Noosa River including funding for
       a Catchment Management Coordinator.



                                                               No. of Initiatives (Environment)

                  Major Disruption


                  Minor Disruption


                         On Track


                        Complete


                                     0        2            4            6            8           10            12           14           16

Page 5

Details of Initiatives that are completed:

 Completed Initiatives

 OP Ref     Initiative                                           Service/Mgr Responsible    Status      Date Delivered
 1.3.5      Implement the Noosa Spit Shoreline Erosion           Infrastructure Planning    Completed   31/08/2024
            Management Plan (SEMP) to protect the Noosa          Design & Delivery
            Spit and river estuary (incl. sand and Noosaville    Manager
            foreshores) from major coastal events.
 1.4.1      Prepare Conservation Management Plans for at         Arts and Culture Manager   Completed   26/03/2025
            least two Council-controlled heritage places to
            inform decision making about conserving and
            managing places of cultural significance.
 1.5.1      Finalise the transition arrangements for the Yurol   Environment Manager        Completed   01/02/2025
            Ringtail State Forest land for conservation to
            expand the area protected for conservation in
            Noosa Shire.


Details of Initiatives that are on track to be completed within scheduled timeframe:

 Initiatives on Target

 OP Ref     Initiative                                           Service/Mgr Responsible    Status      Reason for Status
 1.1.1      Continue to deliver the Modern Water Quality Environment Manager                On Track    Monitoring continuing as planned for all sites. Six-month trial of
            Monitoring Program for the Noosa and Mary River                                             Mary River sub-catchment monitoring has commenced with
            Sub-catchments to monitor the environmental                                                 SCC. Executive briefed on monitoring performance in Jan.
            health of the catchments and identify priority
            areas for management.
 1.2.1      Continue to deliver the Noosa Bushland Reserve Environment Manager              On Track    Program planning completed for 2025 burns. Maintenance of
            Strategic Fire Management Plan 2021 and deliver                                             trails and breaks are being undertaken. Planned Burns are now
            planned burns and mechanical fuel reduction                                                 underway as weather permits.
            where conditions allow in priority reserves, based
            on a comprehensive bushfire risk assessment.

Page 6

Initiatives on Target

OP Ref     Initiative                                           Service/Mgr Responsible    Status     Reason for Status
1.2.2      Continue to deliver a Community Bushcare             Environment Manager        On Track   Annual programs on-track for 2025 for all bush-care groups
           Program for active volunteers across bushland
           care groups and undertake a review of the
           Community Bushland Care Guideline.
1.2.3      Initiate a review of the Biosecurity Plan 2020 to    Environment Manager        On Track   Underway - a draft is currently being reviewed.
           manage invasive species which threaten Noosa's
           biodiversity values.
1.3.1      Finalise the Noosaville Foreshore Management         Infrastructure Planning    On Track   Community feedback received during phase three of
           Plan to provide an asset renewal program for         Design & Delivery                     community engagement, this feedback has been analysed and
           aging infrastructure and in response to increased    Manager                               the draft plan is being revised in close consultation with
           community expectations and the increasing risk of                                          Councillors. Draft plan is being presented for endorsement at
           climate change.                                                                            Councils June meeting
1.3.2      Initiate the implementation of the Eastern           Environment Manager        On Track   Education material complete, public awareness campaign has
           Beaches Foreshore Management Plan 2023                                                     started, restoration program is underway within available
           focusing on education and awareness of the social                                          budget and resourcing, beach infrastructure access manual is
           and environmental values of foreshores, and key                                            80% developed, community workshop planned for Peregian
           management issues.                                                                         area.
1.3.4      Implement the Encroachments Policy and               Environment Manager        On Track   Recovery projects undertaken at Lorikeet Drive and Mulloway
           Operational      procedure,      including     the                                         St., Teewah. Communication material finalised and distribution
           development of a community education and                                                   has been focused on high value areas. Implementation
           awareness campaign to guide community use and                                              initiatives occurring within allocated budget and resourcing.
           management of council managed land.
1.4.2      Document the iconic story of surfing in Noosa to     Arts and Culture Manager   On Track   Oral history interviews completed and these and other digitized
           capture this unique aspect of Noosa’s heritage and                                         materials uploaded to Heritage Noosa. A community event was
           lifestyle.                                                                                 held at The J in March to promote the project and to encourage
                                                                                                      community engagement with the Heritage Noosa site. Material
                                                                                                      collected from donors and interviewees from this FY will be
                                                                                                      digitised by EOFY.
1.5.2      Review the Conservation Land Plan/Policy to Environment Manager                 On Track   Nearing completion to be reported to Council in June/July
           provide a clear methodology for identifying land
           parcels for consideration of purchase (via the
           Environment Levy) for inclusion in the Voluntary
           Conservation Agreement program or the Land for
           Wildlife program.

Page 7

Initiatives on Target

OP Ref     Initiative                                            Service/Mgr Responsible       Status     Reason for Status
1.7.1      Initiate implementation of the Noosa Threatened       Environment Manager           On Track   Action Plans for Koala Conservation and Sea Turtle are 95%.
           Fauna Roadmap including the development of 2                                                   Action Plans for MR Cod and Greater Glider in planning phase
           action plans per year for priority threatened                                                  (development planned for FY25/26).
           species identified in the Noosa Threatened Fauna
           Roadmap.
1.7.2      Initiate a review of the Koala Conservation Plan to   Environment Manager           On Track   Nearing completion.
           ensure recovery and conservation strategies are
           aligned with contemporary populations and
           threats.
1.7.3      Manage flying fox impacts on the community in         Environment Manager           On Track   Minor community disruption managed at Wallace Park. FFox
           accordance with the Noosa Council Statement of                                                 roosts monitored for heat stress during heatwaves. Ongoing
           Management Intent (SoMI) and through                                                           monitoring in accordance with the FFox Management Plans are
           community education.                                                                           ongoing.
1.8.1      Complete the review of the Noosa design               Strategy and Sustainability   On Track   Draft Design Principles document prepared and presented to
           principles including incorporating sustainable        Manager                                  Councillor workshop April 2025. External key stakeholder
           design to embed climate resilience, nature                                                     engagement to commence May / June 2025.
           positive and low carbon considerations into the
           principles, and promote and increase awareness
           with key stakeholders.
1.8.2      Continue       to   implement      best    practice   Development Assessment        On Track   Implementation continuing.
           Development Assessment services that deliver the      Manager
           strategic outcomes of the Noosa Plan 2020.
1.8.3      Ensure all Council capital, civil and maintenance     Infrastructure Planning       On Track   All works are subject to review by internal working groups and
           works are planned, delivered, and maintained in       Design & Delivery                        executive of Council across broad internal representation to
           accordance with the Noosa Design Principles,          Manager                                  ensure consistency with the Noosa Design Principles. Staff have
           legislative requirements, and best environmental                                               also been actively contributing to the update of the Noosa
           practice. This includes minimising impacts on                                                  Design Principles currently underway as a part of cross Council
           environmental       values    and     incorporating                                            collaboration project to further improve the standards of design
           flora/fauna sensitive designs into project planning                                            and project outcomes.
           and delivery, where practical.

Page 8

Details of Initiatives that are experiencing delays/disruptions:

 Initiatives not on Target

 OP Ref     Initiative                                          Service/Mgr Responsible   Status       Reason for Status
 1.1.2      Enhanced management of bio basins in formal         Environment Manager       Minor        Some delays in delivering maintenance schedule due to adverse
                                                                                          Disruption
            asset management systems incl. asset                                                       weather conditions.
            management and renewal to reduce harmful
            stormwater runoff to protect and improve
            waterway health.
 1.3.3      Identify high-risk erosion prone areas of the       Strategy and              Major        Progress through the High-Risk Erosion Prone Area Working
                                                                                          Disruption
            Climate Change Adaption Plan (CHAP) and scope       Sustainability Manager                 Group has stalled due to staff changes and limited delivery of
            an ongoing management program.                                                             CHAP actions. A Noosa Eastern beach creeks erosion risk report
                                                                                                       has been delivered by consultants and is currently under review.


 1.6.1      Finalise and initiate implementation of the Noosa   Environment Manager       Major        Delayed to FY2025/26 due to congested community
                                                                                          Disruption
            River Catchment Management Plan to help protect                                            engagement calendar. Awaiting the Catchment Action Plan
            catchment values and ecosystem services.                                                   framework from the Resilient Rivers Initiative office. Catchment
                                                                                                       Coordinator role is currently being advertised.

Page 9

Theme 2: Liveability – Q 3 Initiatives Progress


Highlights:

       •   Council has completed multiple Access and Amenities DDA compliance audits on community halls and centres to inform future budget initiatives to
           improve access for all users at these important community facilities.
       •   A Housing Monitoring program has been developed for the systematic collection, analysis, and reporting of data related to housing conditions,
           availability, affordability, and development to support informed decision-making and policy development for the housing sector.
       •   Council has endorsed a new Public Art Policy providing a framework for the planning, installation, maintenance and decommissioning of public art
           on public land, within the public domain of the Noosa Council area.
       •   Council has endorsed a new Community Grants Policy guiding the administration of Council’s Community Grants to ensure grant programs assist
           Council to achieve its strategic goals and identified initiatives.
       •   Council completed the Noosa Aquatic Centre Facility Upgrade Plan with the aim to guide a thoughtful and compliant transformation of the NAC over
           the next 20 years, ensuring the facility continues to serve the community's needs into the future.


                                                             No. of Initiatives (Liveability)

                  Major Disruption


                  Minor Disruption


                         On Track


                        Complete


                                     0     2           4          6          8          10         12         14          16         18

Page 10

Details of Initiatives that are completed:

 Completed Initiatives

 OP Ref    Initiative                                          Service/Mgr Responsible    Status      Date Delivered
 2.3.1     Finalise and commence implementation of the         Arts and Culture Manager   Completed   14/03/2025
           Public Art Policy to improve the character and
           aesthetics of public spaces.
 2.5.3     Complete community halls Disability                 Property Manager           Completed   01/02/2025
           Discrimination Act (DDA) compliance and asset
           management condition assessments to ensure
           quality, accessible and fit for purpose community
           facilities.
 2.6.2     Review and complete the Community Grants            Community Connection       Completed   23/01/2025
           program and policy to further support community     Manager
           organisations to deliver community development
           initiatives.
 2.7.3     Investigate a new revenue system which ensures      Infrastructure Planning    Completed   03/04/2025
           visitors contribute to the provision and            Design & Delivery
           maintenance of transport facilities and services    Manager
           they utilise.
 2.8.1     Deliver the Living Well Noosa program to improve    Community Connection       Completed   01/02/2025
           the health and well-being of the community.         Manager

Page 11

Details of Initiatives that are on track to be completed within scheduled timeframe:

 Initiatives on Target

 OP Ref     Initiative                                           Service/Mgr Responsible       Status     Reason for Status
 2.1.1      Continue to implement key actions of the Noosa       Strategy and Sustainability   On Track   Housing Strategy update and proposed Housing Monitoring
            Housing Strategy including:                          Manager                                  program reported to Council March 2025. Housing Monitoring
                •    Development of a Housing Monitoring                                                  being prepared and Housing ID engaged for data analysis;
                     program.                                                                             continued engagement with state on development of sites in
                • Partnering       with    State    Housing                                               Tewantin and across Noosa; Site investigations completed at 62
                     Department,     Community      Housing                                               Lake Macdonald Drive, community engagement undertaken
                     providers and industry to advance the                                                and report submitted to Council on revised site option; Civil
                     planning and development of affordable                                               works and remediation tender documents advertised.
                     housing.                                                                             Successful grant obtained under Federal Housing Support
                • Continue site investigations at Lake                                                    Program for master planning of Council sites for affordable
                     Macdonald Drive, Cooroy, for affordable                                              housing; Scope for master planning of carpark sites
                     housing outcomes.                                                                    workshopped with Councillors; proposed planning scheme
                • Identifying      grant     and     funding                                              amendments on housing affordability awaiting Minister's sign
                     opportunities for affordable housing                                                 off submitted February 2025.
                     outcomes.
 2.1.2      Continue to implement and monitor the Short Stay     Development Assessment        On Track   Short Stay Local Operational Review has significantly
            Letting Local Law to manage the impacts of short-    Manager                                  progressed. The stakeholder survey has been completed and
            term letting.                                                                                 the feedback reviewed. Stakeholder roundtable session
                                                                                                          completed, feedback to be included in upcoming workshop to
                                                                                                          Council in Q4. Recent process improvements enabling improved
                                                                                                          complaint follow up and resolution. Ongoing audits and active
                                                                                                          management are continuing.
 2.2.1      Complete the upgrade of the Woondum and              Infrastructure Planning       On Track   Project reference group has been re-established to guide scope
            Wahpunga trails in accordance with the Noosa         Design & Delivery                        of works. On the ground works has commenced, with ongoing
            Biosphere Trails Master Plan to improve the          Manager                                  procurement underway for remaining works to meet grant
            condition of trails, increase connectivity between                                            obligations.
            Cooran, Kin Kin and Lake McDonald, and
            recreational activity.
 2.2.3      Maintain the standard of pathways throughout         Infrastructure Planning       On Track   The 2024/25 Capital Works Program includes over $2m worth
            the shire through the delivery of the pathway’s      Design & Delivery                        of pathway upgrades and renewals. Pathway projects upgrades
            renewal program.                                     Manager                                  are progressing, and pathway renewal projects are confirmed
                                                                                                          and proceeding to design / procurement phases.

Page 12

Initiatives on Target

OP Ref     Initiative                                              Service/Mgr Responsible       Status     Reason for Status
2.3.2      Prepare for the delivery of the biennale Floating Arts and Culture Manager            On Track   Preparations for Floating Land 2025 'Escape Making' are well
           Land 2025 event which brings arts and culture to a                                               underway with the completion of the first artist camp at Boreen
           contemporary community.                                                                          Point and the opening of applications for contributions. The
                                                                                                            event will run from 28 June to 27 July, 2025.
2.4.1      Complete and deliver the Movement and                   Strategy and Sustainability   On Track   Review of actions included in the Transport Plan and Cycling and
           Connection Delivery Plan to improve transport           Manager                                  Walking Strategy undertaken. A draft Delivery Plan prepared for
           links, walking and cycling connections and                                                       internal review. Draft to be discussed at Councillor workshop
           movements.                                                                                       April 2025.
2.4.2      Commence a Northern Sunshine Coast Public               Infrastructure Planning       On Track   The NSCPTS is progressing as scheduled, with Noosa Council
           Transport Strategy including advocating with            Design & Delivery                        actively working in partnership with TMR, Sunshine Coast
           DTMR for the finalisation of the strategy and           Manager                                  Council and consultants to advance the draft plan. A draft plan
           undertaking investigations into the Cooroy and                                                   is anticipated to be released in coming months for broader
           Shire transit hubs to improve public transport                                                   review.
           connectivity in the shire for residents and visitors.
2.4.3      Deliver the Cycling and Walking Implementation          Infrastructure Planning       On Track   Pathways works are being delivered across the Shire as part of
           Plan to guide Council’s planning, development and       Design & Delivery                        the 24/25FY Capital Works program. The Implementation plan
           promotion of bike and walking networks in the           Manager                                  is being used to support project bids and grant submissions for
           future.                                                                                          the 25/26FY capital works program. Key initiatives that have
                                                                                                            progressed include the Noosa Coastal Pathway (Peregian Beach
                                                                                                            Active Street), Noosa Drive Pathway Design, Noosa Parade
                                                                                                            Stage 2 Design, grant submissions for Hilton Esplanade Cycle
                                                                                                            Street and Pomona Walking Network Plan and the delivery of
                                                                                                            the Local Links footpath program including the connector to
                                                                                                            Pomona Secondary College.
2.4.4      Develop the Noosa Parking Management Plan to Infrastructure Planning                  On Track   The Parking Management Plan is progressing well. The draft
           guide our approach to the management of parking Design & Delivery                                framework and local area plans have been prepared and subject
           throughout the shire.                           Manager                                          to a series of Councillor workshops to review and refine content
                                                                                                            before broader community engagement later this year.

Page 13

Initiatives on Target

OP Ref     Initiative                                           Service/Mgr Responsible      Status     Reason for Status
2.4.5      Embed the Go Noosa program including the free Infrastructure Planning             On Track   The Go Noosa Christmas and Easter period has concluded, and
           weekend and holiday bus program, as part of the Design & Delivery                            a review of the initiatives is now underway. An interim review
           Transport Strategy to reduce traffic congestion Manager                                      of the Go Noosa program was presented to Council recently in
           and reduce emissions.                                                                        light of the ongoing 50c fares and led to Council endorsing a
                                                                                                        reprofiling of the free bus program to focus on the Loop Service.
                                                                                                        The full evaluation of the Go Noosa program is scheduled to be
                                                                                                        presented to Council meetings in July.
2.4.6      Undertake investigations into the Noosa Woods Infrastructure Planning             On Track   Consultant has been appointed to lead the investigation and
           Jetty as potential ferry stop location as a means of Design & Delivery                       targeted stakeholder engagement has occurred to inform
           public transportation, and to provide increased Manager                                      consultants initial findings. A workshop is planned with
           access to Noosa Woods.                                                                       Councillors in the near future to share findings and establish
                                                                                                        directions for the investigations.
2.5.1      Complete a new Noosa Libraries Business Plan to      Arts and Culture Manager     On Track   First draft of Libraries Business Plan under review. Due for
           ensure the delivery of a well-planned service that                                           completion Q4 FY24/25.
           meets community needs.
2.5.2      Continue to undertake the staged implementation      Sport and Active Lifestyle   On Track   Ongoing with projects such as ND Netball clubhouse
           of Master Plans for the Cooroy and Noosa District    Manager                                 redevelopment underway, CDSC has several projects currently
           Sports Complexes to improve sport and recreation                                             in planning and development stage
           facilities and increase participation in sports.
2.5.4      Commence the design process for an Accessible        Infrastructure Planning      On Track   Design Brief and amenities siting completed. Consultant
           Adult Change Facility as part of the Noosaville      Design & Delivery                       working towards a Concept Design for further Council review in
           Foreshore Management Plan.                           Manager                                 the near future following final consideration of the Noosaville
                                                                                                        Foreshore Infrastructure Master Plan.
2.5.6      Provide inclusiveness coaching support to            Sport and Active Lifestyle   On Track   Council's Inclusion Coach continues to implement and deliver
           community groups to increase community               Manager                                 the Sport4All program across the shire working with schools and
           participation for people with disabilities.                                                  clubs
2.7.2      Complete a needs assessment for the Noosa            Sport and Active Lifestyle   On Track   NLC Needs Assessment completed and NAC project at latter
           Leisure Centre and Noosa Aquatic Centre to           Manager                                 stages of delivery
           provide a basis on which the sporting needs of the
           community are determined.
2.8.2      Undertake a proactive auditing programme of          Building and Plumbing        On Track   Kin Kin Audit program completed. Branch to move onto stage 2
           wastewater treatment systems to keep                 Manager                                 Cootharaba Audit, which is currently being planned. Letter drop
           community safe and maintain water quality and                                                to residents being prepared.
           the health of waterways.

Page 14

Details of Initiatives that are experiencing delays/disruptions:

 Initiatives not on Target

 OP Ref     Initiative                                            Service/Mgr Responsible    Status       Reason for Status
 2.2.2      Finalise the Noosa Botanic Gardens Master Plan to     Civil & Asset Operations   Minor         Stakeholder Reference Group and Internal Working Groups
                                                                                             Disruption
            help guide future improvements and enhance the        Manager                                  meetings were conducted late 2024 including presentation of
            visitor experience.                                                                            initial concepts for feedback. Initial public consultation
                                                                                                           undertaken. Consultants have advanced draft plan. Further
                                                                                                           stakeholder reference group meetings held in March 2025
                                                                                                           which has led to further plan refinement. Draft plan proposed
                                                                                                           to submitted for Council in July 2025 for endorsement for
                                                                                                           further public consultation.
 2.5.5      Finalise the review of community purpose land and     Property Manager           Minor         A second councillor workshop was undertaken. Councillors have
                                                                                             Disruption
            the Infrastructure Tenure Policy to provide a                                                  requested for external stakeholder consultation occur. It was
            consistent framework to ensure the equitable use                                               agreed that this will likely extend timing into next financial year
            of community purpose land and infrastructure                                                   in terms of the completion of the review and adoption of an
            within is utilised to its full potential.                                                      updated policy.
 2.6.1      Undertake the preparatory phase for the proposed      Community Connection       Major        No internal staffing or funding for external resourcing available
                                                                                             Disruption
            development of a new Community Strategy which         Manager                                 to begin this initiative this quarter and this is unlikely to change
            outlines the community’s vision for Noosa and                                                 for the remainder of the financial year. Budget request
            guides planning and decision making.                                                          submitted.


 2.7.1      Complete Noosa Cemeteries Plan to guide the           Community Connection       Minor        Consultation has been undertaken with key stakeholders. Draft
                                                                                             Disruption
            future management of council’s cemeteries and         Manager                                 has been completed and under review. Progress constrained by
            ensure cemetery services meet future demand.                                                  available resourcing.


 2.7.4      Continue to progress asset management planning        Community Services         Minor        Building condition assessment reports (BCARs) 40% completed
                                                                                             Disruption
            for council’s community services buildings and        Director                                with further BCARs underway. 28% of comprehensive Asset
            community infrastructure to ensure their ongoing                                              Management Plans (AMPs) near completion. Progress
            suitability to meet the functional needs of current                                           constrained by available resourcing. Budget request submitted.
            and future users.

Page 15

Theme 3: Prosperity – Q 3 Initiatives Progress



Highlights:
   •      Final amendments to Noosa Plan 2020 Amendment No. 2 submitted to the State in February 2025, awaiting Ministerial approval for adoption and
          commencement.



                                                                      No. of Initiatives (Prosperity)

                          Major Disruption


                          Minor Disruption


                                 On Track


                                Complete


                                             0    1               2            3             4               5            6   7   8




Details of Initiatives that are completed:

 Completed Initiatives

 OP Ref      Initiative                                           Service/Mgr Responsible        Status      Date Delivered
 3.2.1       Progress investigation of a future skills learning   Economic Development           Completed   25/04/2025
             hub and Skills Plan to identify current and future   and Destination
             skill needs for priority Noosa businesses.           Management Manager
 3.6.1       Complete stage 3 of the Regional Art Gallery         Arts and Culture Manager       Completed   02/12/2024
             Feasibility Project including a Business Plan for
             council’s consideration.

Page 16

Details of Initiatives that are on track to be completed within scheduled timeframe:

 Initiatives on Target

 OP Ref     Initiative                                    Service/Mgr Responsible   Status     Reason for Status
 3.1.2      Implement the Noosa Economic Development Economic Development           On Track   Delivery of Noosa Smart Biosphere Economic Development
            Smart Biosphere Strategy (NEDS) Action Plan and and Destination                    (Action) Plan and priorities including:
            identify and advance priority projects including Management Manager                    •    Development of Destination Management Plan
            the activation of strategic employment land.                                                (November 2025 adoption)
                                                                                                   •    Gold Eco-Destination Accreditation
                                                                                                   •    Development of Noosa Council Events Strategy
                                                                                                   •    Implementation of Green Economy Plan, including
                                                                                                        activation of Circularity Precinct in collaboration with
                                                                                                        Waste Management, building capacity in green
                                                                                                        businesses and auditing Noosa's Electric Vehicle
                                                                                                        capacity    and     enabling     infrastructure    needs
                                                                                                        collaboration with Waste Management Branch
                                                                                                        (ongoing)
                                                                                                   •    Industry Development Plans - including Food &
                                                                                                        Beverage and Education (both anticipated by EOFY
                                                                                                        24/25)
                                                                                                   •    Strategic Employment Land Project Expression of
                                                                                                        Interest (scheduled for Q3 FY24/25 moved to Q4
                                                                                                        FY24/25).
                                                                                                   •    Food and Agribusiness Hub Proof of Concept (EOI
                                                                                                        scheduled for Q4 FY24/25)
                                                                                                   •    Business Support Programs (Business Boost/ECDEV
                                                                                                        Grant/Capability       Workshops        and     Industry
                                                                                                        Communications) ongoing
 3.3.1      Advance the preparation of a Food and Economic Development              On Track   Industry Development Plan underway).
            Agribusiness Industry Development Plan and and Destination                         Ongoing industry skills needs delivered in partnership with Food
            progress key actions with the Food and Management Manager                          and Agribusiness Network (FAN). Negotiations for FY25/26
            Agribusiness Network (FAN).                                                        activity commenced with FAN.

Page 17

Initiatives on Target

OP Ref     Initiative                                            Service/Mgr Responsible    Status     Reason for Status
3.5.1      Complete amendments to Noosa Plan 2020 to             Economic Development       On Track   Final amendments submitted to State February 2025 awaiting
           support and enable the Innovation precinct at the     and Destination                       Ministerial approval for adoption and commencement.
           Shire Business Centre to develop.                     Management Manager                    Activation discussions continue with Stockwell Group.
3.7.1      Develop the Noosa Landfill and Resource Recovery      Waste Manager              On Track   Key projects within stage 1 of the Masterplan have advanced
           Facility Master Plan to provide future direction in                                         with Development Application lodged in Feb 2025 for Council
           the management of the Resource recovery centre                                              consideration to provide for a shovel ready project. Grant
           and maximise waste diversion and minimisation                                               funding application has been submitted with the Federal
           practices.                                                                                  Government. A Council briefing is also scheduled for May 2025
                                                                                                       on the Master Plan progress
3.7.2      Implement best practice waste management Waste Manager                           On Track   Waste Plan 2023-2027 action tracker has been developed with
           practices and continuous improvement across all                                             a project plan to support delivery of key milestones. This is
           waste functions and assets to support the                                                   monitored by the team monthly. Recent environmental
           principles of the waste hierarchy and actions in the                                        performance reporting has shown ongoing reduction in carbon
           Waste Plan.                                                                                 emissions and waste diversion consistent with Waste Plan
                                                                                                       targets.
3.7.3      Complete feasibility studies and development Waste Manager                       On Track   Expression of Interest is underway for a compost facility, with
           plans for new waste infrastructure projects incl.                                           invitation to the open market to design, construct, commission
           anerobic digestion, composting, biochar and solar                                           and handover of a green waste composting process plant.
           and utilisation of landfill gas and explore options
           and funding mechanisms.                                                                     Internal project bids have been submitted for 25/26FY to
                                                                                                       continue exploring feasibility of waste infrastructure projects
                                                                                                       including biochar, anaerobic digestion and utilisation of landfill
                                                                                                       gas.
3.8.1      Initiate scoping and seek grant or external funding Digital Hub and Innovation   On Track   Collaboration partners have been secured. Test plan 90%
           to advance the concept of Noosa Shire as a ‘Living Director                                 complete. Detailed test planning being finalised in working
           Lab’ – partnering with industry and research                                                groups. First briefing complete. Second briefing due 14th May.
           organisations to investigate, use data and                                                  1st week June conduct pending casa approvals and weather.
           technology to develop innovative solutions for                                              Potential to slide up until school holidays.
           Noosa.
                                                                                                       The grant application for Cities Deal funding to create a smart
                                                                                                       mobility lab in the Peregian Digital Hub precinct was
                                                                                                       unsuccessful.

Page 18

Details of Initiatives that are experiencing delays/disruptions:

 Initiatives not on Target

 OP Ref     Initiative                                            Service/Mgr Responsible   Status       Reason for Status
 3.1.1      Advance the Sustainable Procurement Policy and        Procurement Manager       Minor        Sustainable Procurement Matrix review underway.
                                                                                            Disruption
            establish practices for Council’s procurement of
            services and products.
 3.1.3      Progress the embedding of sustainable                 Procurement Manager       Minor        Council sustainability pillars have been included in Contract
                                                                                            Disruption
            procurement practices into Council’s procurement                                             Number Request Form to capture procurement activity that
            of services and products, through the adoption of                                            includes one of the elements.
            a formal policy position, as well as developing an
            education,     measurement,       and    reporting
            framework.
 3.4.1      Scope, prepare and initiate a pre-feasibility for a   Economic Development      Minor        Initial scoping and project plan scheduled in Q3 FY24/25
                                                                                            Disruption
            Food and Agri Business HUB.                           and Destination                        rescheduled for Q4 FY24/25
                                                                  Management Manager

Page 19

Theme 4: Future – Q3 Initiatives Progress



Highlights:

   •   Pomona Place Program Plan completed and endorsed by Council. This plan reflects the collective vision and aspirations of the Pomona community,
       providing a roadmap to ensure Pomona remains a unique, vibrant, and liveable town.

   •   Development of Federal Election Advocacy Plan and Priorities for the 2025 Federal Election to support the strategic goals detailed in Council’s
       corporate plan to make Noosa a better shire for those who live, work and visit here.




                                                           No. of Initiatives (Future Theme)

                  Major Disruption


                  Minor Disruption


                         On Track


                        Complete


                                     0         2              4              6              8             10             12             14

Page 20

Details of Initiatives that are completed:

 Completed Initiatives

 OP Ref     Initiative                                          Service/Mgr Responsible       Status      Date Delivered
 4.8.2      Deliver Disaster preparedness, Resilience and Infrastructure Services             Completed   31/03/2025
            Recovery activities to support Council and the Director
            broader community.


Details of Initiatives that are on track to be completed within scheduled timeframe:

 Initiatives on Target

 OP Ref     Initiative                                          Service/Mgr Responsible       Status      Reason for Status
 4.1.1      Continue to engage with our traditional owners Strategy and Environment           On Track    27 formal engagements held this FY thus far. Relationship
            and ensure cultural heritage and indigenous Director                                          Agreement and Kabi Kabi Commitment Implementation Plan
            values are incorporated into key projects.                                                    drafts have gone through their second review by KKPAC and are
                                                                                                          close to completion by end of FY24/25.
 4.2.2      Undertake a review of the Tourism Noosa Manager Economic                          On Track    Review completed and recommendations presented to
            Partnership Agreement to align with DMP Development and                                       Executive in Q3 FY24/25. Councillor workshops undertaken.
            outcomes.                               Destination Management                                Report prepared. Special Council Meeting Scheduled in early
                                                                                                          May.
 4.3.1      Develop initiatives/concept to facilitate youth     Communications and            On Track    Have started the process of establishing a Community
            engagement in community engagement and              Community Engagement                      Engagement Feedback Panel and seeking youth involvement in
            decision making with the goal of increasing youth   Manager                                   this process.
            representation.
 4.4.1      Finalise the amendments to the Noosa Plan 2020      Strategy and Sustainability   On Track    Final amendments submitted to state in February 2025 awaiting
            and seek to implement the Noosa Housing             Manager                                   Ministerial approval for adoption and commencement.
            Strategy 2022 to address housing challenges faced
            by our residents.
 4.4.2      Complete the Advocacy Plan that addresses top 10    Strategy and Environment      On Track    Advocacy plans have been completed in advance of both the
            Shire wide issues and infrastructure needs.         Director                                  State and Federal elections. These plans identify Council's top
                                                                                                          priorities. The Plan was supported by an advocacy document,
                                                                                                          individual letters and contacts, meetings with candidates and
                                                                                                          follow up after the election.

Page 21

Initiatives on Target

OP Ref     Initiative                                            Service/Mgr Responsible       Status     Reason for Status
4.5.1      Complete the Place Pilot Program in Pomona and        Strategy and Sustainability   On Track   Final Pomona Place Plan endorsed by Council March 2025.
           share learnings to improve the future of the          Manager                                  Evaluation report under preparation.
           program and inform future planning for Pomona.
4.6.1      Undertake preliminary planning for the Brisbane       Sport and Active Lifestyle    On Track   Continuing to evaluate latest developments and actions on
           Olympics and Paralympics 2032.                        Manager                                  games planning through CoMSEQ. Internal discussions with
                                                                                                          relevant impacted portfolios has started. We have paused
                                                                                                          commencement of internal working group until more is known
                                                                                                          on overall Brisbane 2032 strategic direction.
4.6.2      Develop and maintain relationships with key Sport and Active Lifestyle              On Track   Officers and Councillors attending various COM SEQ
           Brisbane 2032 stakeholders.                 Manager                                            committees and meetings to ensure involvement when
                                                                                                          required/appropriate.
4.7.1      Develop the Emissions Offset strategy/plan and Strategy and Sustainability          On Track   Roadmap to Net Zero Emissions project is currently in
           road map towards Zero emissions for council Manager                                            procurement phase with the series of Councillor workshops
           services.                                                                                      having already started. Minor delays experienced due to staff
                                                                                                          resource limitations and procurement hurdles. Estimate
                                                                                                          completion by end of calendar year.
4.8.1      Advance the Sunshine Coast and Noosa Regional         Strategy and Sustainability   On Track   Completing Stage 6 and 7 of the project including the economic
           Climate Action Roadmap by delivering the              Manager                                  analysis for Noosaville Depot and sharing lessons learned more
           Regional     Cascading     Risks     and   Critical                                            broadly. On track for final completion by EOFY with embedding
           Infrastructure Failure Project with Sunshine Coast                                             of project findings as the next step.
           Regional Council.
4.8.3      Complete the implementation of the Disaster           Community Services            On Track   Final reconstruction projects near completion. Human social
           Recovery Plan for the 2022 Floods & Rain Event.       Director                                 Recovery Plan completed.
4.8.4      Continue the implementation of the Coastal Strategy and Sustainability              On Track   Phase 2 of the Coastal Wetland Restoration Project with
           Hazards Adaptation Plan (CHAP), including Manager                                              University of Queensland and KKPAC is underway. An initial site
           planning for Living Foreshores Noosa, Coastal                                                  assessment on Cooloothin Cr Nature Refuge has been
           Wetland Restoration Project.                                                                   undertaken and grant funding is being sought through
                                                                                                          QCoast2100 Round 3. Living Foreshores Noosa continues to
                                                                                                          advance with Hilton Esplanade due to restart this quarter.

Page 22

Details of Initiatives that are experiencing delays/disruptions:

 Initiatives not on Target

 OP Ref     Initiative                                       Service/Mgr Responsible    Status       Reason for Status
 4.2.1      Complete the Destination Management Plan,        Economic Development       Minor        Councillor workshops tabling new approach completed Q3
                                                                                        Disruption
            integrating community feedback for Council       and Destination                         FY24/25. Further Project Control Group (PCG) engagement
            endorsement, and commence cross-council          Management Manager                      requested prior to next Council Workshop in Q4 FY24/25.
            implementation of priority actions.

 4.8.5      Advance flood resilience projects including      Strategy and               Minor        Recent staff changes with two current vacancies in the team
                                                                                        Disruption
            updating the Noosa River Flood Study, Six Mile   Sustainability Manager                  has resulted in minor disruptions to the set of flood planning
            Creek Flood Study and Noosa Flood Management                                             projects underway. Council was also unsuccessful in receiving
            Plan.                                                                                    QRA approval on the flood planning backfill resource to project
                                                                                                     manage flood resilience projects. The Climate Change
                                                                                                     Adaptation Program Lead role has been filled with some flood
                                                                                                     projects re-commencing.
 4.9.1      Progress the development of a program for long   Strategy and Environment   Minor        Strategic Land investigation review complete and supported by
                                                                                        Disruption
            term implementation of contemporary revenue      Director                                the Strategic Land Activation Policy, a pipeline of work is being
            diversification and a strategic investment                                               developed. Investigations underway on council carparks
            approach for innovative and alternate revenue                                            supported by grant funding.
            streams for council.

Page 23

Theme 5: Excellence – Q 3 Initiatives Progress


Highlights:

   •   A new Integrated Compliance & Enforcement Policy has been prepared for council endorsement. The Policy is proposed to provide a clear,
       contemporary framework for Council to administer its responsibilities in a safe, fair, unbiased, balanced, consistent and transparent manner.
   •   Council’s website has been transitioned from its existing content management system to an improved platform which increases functionality, website
       performance and lifts Council’s online presence.




                                                          No. of Initiatives (Excellence Theme)

                  Major Disruption


                  Minor Disruption


                         On Track


                        Complete


                                     0         2              4              6              8              10             12             14

Page 24

Details of Initiatives that are completed:

 Completed Initiatives

 OP Ref    Initiative                                           Service/Mgr Responsible    Status      Date Delivered
 5.1.3     Transition Council’s website from its existing       ICT Manager                Completed   28/02/2025
           content management system to an improved
           platform which increases functionality, website
           performance and lifts Council’s online presence.
 5.4.4     Review the Workplace Health and Safety Policy and    People and Culture         Completed   09/04/2025
           develop a new annual Workplace Health and Safety     Manager
           Management
           System Plan.
 5.4.6     Undertake an employee engagement survey to           People and Culture         Completed   25/10/2024
           assess workplace wellbeing and staff satisfaction.   Manager
 5.5.4     Complete the new Council Privacy Policy for Governance Manager                  Completed   01/02/2025
           Council’s consideration to strengthen our
           governance framework.
 5.5.6     Finalise the Contract Management Framework and Procurement Manager              Completed   30/06/2025
           implementation plan
 5.6.1     Increase the capabilities of engagement              Communications and         Completed   01/02/2025
           ambassadors throughout the organisation through      Community Engagement
           training and collaboration to ensure better          Manager
           outcomes       when      conducting    community
           engagement on projects and initiatives.
 5.7.3     Finalise the Strategic Land Review of council land   Strategy and Environment   Completed   01/01/2025
           holdings to identify opportunities for activation    Director
           and engagement.

Page 25

Details of Initiatives that are completed:

 Initiatives on Target

 OP Ref     Initiative                                           Service/Mgr Responsible   Status     Reason for Status
 5.1.1      Implement a Customer Experience Program to Customer Experience                 On Track   CX Steering Committee meeting regularly; Systems & Processes,
            create better experiences for our customers Manager                                       Customer Service Charter, Community Satisfaction Survey
            across the organisation.                                                                  Working Groups formed; Councillor, Executive and Leadership
                                                                                                      Group briefed. Implementation of actions constrained by
                                                                                                      available resourcing.
 5.1.2      Assess the community’s satisfaction with Council     Community Services        On Track   Preparation underway for Satisfaction Survey to go live May
            services to identify opportunities for improved      Director                             2025. Final report from consultant expected end of June 2025.
            service delivery.
 5.2.3      Finalise the review of the Service Level Catalogue   Chief Executive Officer   On Track   To occur as part of the 2025/26 budget process/report.
            to assist Council in planning and delivering
            sustainable services to the community.
 5.3.3      Develop a contemporary Integrated Enforcement        Local Laws Manager        On Track   In draft proposed completion second quarter 2025.
            and Compliance Policy.                                                                    Final draft completed March 2025. Council Workshop
                                                                                                      conducted in March 2025, with no additional feedback or
                                                                                                      changes to the Policy. Council Report (currently drafted) to be
                                                                                                      tabled in May 2025.
 5.3.4      Implement a business improvement program to Chief Executive Officer            On Track   Key departments have engaged business improvement officers
            identify opportunities for increased efficiency and                                       to link in with ICT Business Improvement Officer to identify
            effectiveness in Council’s operations.                                                    efficiencies and possible system upgrades or new systems
                                                                                                      requirements. The rollout of the system improvements is
                                                                                                      progressing well and implementation is expected as
                                                                                                      programmed.
 5.4.1      Develop      an     appropriate      capability Chief Executive Officer        On Track   Annual branch plans to deliver on Operational Plan objectives
            framework/plan (finance, systems and people)                                              are compulsory for all branches. New systems and upgrades are
            that supports the Corporate Plan objectives.                                              being identified and a specific budget has been allocated to
                                                                                                      support their implementation. The work on an overall
                                                                                                      consolidated capability plan and framework is on the task list for
                                                                                                      2025/26.

Page 26

Initiatives on Target

OP Ref     Initiative                                           Service/Mgr Responsible       Status     Reason for Status
5.4.3      Continue to promote the Thrive Program to People and Culture                       On Track   The Thrive Working Group continues to promote wellbeing
           support employee wellbeing.               Manager                                             through its 2025 calendar of events, which include Thrive and
                                                                                                         Work Well all-org event in July 2025, EAP review and Corporate
                                                                                                         Health provider review. We are promoting the Biggest Morning
                                                                                                         tea this year to raise money for cancer, we are launching a new
                                                                                                         program called Thrive Active, and we are continuing with our
                                                                                                         previous initiatives such as Thrive in Nature.
5.5.2      Co-ordinate a review of Council’s Strategic Risk Governance Manager                On Track   Workshop with councillors to commence review of Council's
           Register with the new Council to identify and                                                 Enterprise Risk and Opportunity Management Policy which
           mitigate against any emerging risks and determine                                             includes Council's risk appetite levels will be scheduled this FY,
           Council’s risk appetite                                                                       with the support of Council's insurance provider (Regional Risk
                                                                                                         Coordinator). Update on Council's Strategic Risk Register will
                                                                                                         form part of the upcoming workshop.
5.5.3      Continue to implement actions to increase the Chief Executive Officer              On Track   Recommendations from the review are being progressively
           effectiveness of the Audit and Risk Committee and                                             addressed. External consultant has been engaged and is
           the internal audit function.                                                                  currently reviewing Audit Actions Register and developing
                                                                                                         Internal Audit Plan with first audit scheduled for Q4 FY24/25. IA
                                                                                                         Policy and ARCO Charter under review and to be reported to
                                                                                                         ARCo meeting May 25.
5.5.5      Facilitate a mid term ‘check in’ with Councillors on Chief Executive Officer       On Track   Planned for mid term 2025-26.
           the Corporate Plan.
5.8.1      Continued       implementation       of      Asset   Civil & Asset Operations      On Track   Council adopted the Strategic Asset Management Plan 2024-
           Management        framework,     including     the   Manager                                  2030 at the Services and Organisation Committee Meeting 10
           development       of    the    Strategic     Asset                                            Dec 24. The ongoing implementation of the Asset Management
           Management Plan which includes a hierarchy for                                                Framework is monitored through Council Asset Management
           total management plans and functional asset                                                   Steering Committee.
           management plans.
5.9.2      Initiate review of the Local Government              Strategy and Sustainability   On Track   Internal working groups established, background investigations,
           Infrastructure Charges Plan (LGIP) to identify the   Manager                                  review of desired standards of service and identification of
           long term infrastructure needs of the community.                                              future trunk infrastructure underway. Report on 5 yearly review
                                                                                                         was submitted to Council March 2025 resolving to prepare LGIP
                                                                                                         amendment.

Page 27

Details of Initiatives that are experiencing delays/disruptions:

 Initiatives not on Target

 OP Ref     Initiative                                          Service/Mgr Responsible    Status       Reason for Status
 5.2.1      Progress embedding sustainability within the        Strategy and Environment   Minor         An embedding roadmap has been developed and been
                                                                                           Disruption
            organisation through the development and            Director                                 socialised with the internal Sustainability Working Group. A
            implementation of a sustainability                                                           grant application to QCRC for resources to progress phase one
            framework.                                                                                   of the embedding road map which looks at embedding climate
                                                                                                         risk and sustainability. We are awaiting the outcome of the
                                                                                                         grant before taking further steps.
 5.2.2      Finalise the development of the Financial           Finance Manager            Major        Strategic Land Review complete. Funding and revenue
                                                                                           Disruption
            Strategy, supported by the 10-year financial plan                                           diversification strategy in concept stage, with long term
            model, and incorporating the                                                                financial strategy to be developed in 2025/26. Progress
            Funding Strategy, Revenue Diversification                                                   delayed due to resourcing constraints and competing priorities.
            Strategy, and the Strategic Land Review.
 5.2.4      Complete the audit of all water and electricity     Procurement Manager        Minor        The Utilities Analyst role has been allocated to the
                                                                                           Disruption
            meters and review contract and tariff                                                       Procurement Branch - sourcing options for appropriate
            arrangements to ensure efficient                                                            resourcing are currently in progress.
            service connections and pricing.

 5.2.5      Complete Council's Performance Measurement          Chief Executive Officer    Major        Development of the various components of the framework is
                                                                                           Disruption
            Framework to support Council to actively manage                                             ongoing with the focus now implementing the Corporate
            and improve                                                                                 Reporting System. The system has been trialled Q2 FY24/25.
            organisational performance.                                                                 Following on from this the system and required training has
                                                                                                        been rolled across Council and with the current Q3 updated
                                                                                                        entered and reported through the T1 module. Following
                                                                                                        further system development the focus will be on KPI reporting.
                                                                                                        ICT resource limitations and staff changes have caused a delay
                                                                                                        in delivery. New resource to be allocated in FY25/26.
 5.3.1      Develop a new ICT and Digital Strategy to provide   ICT Manager                Minor         The ICT and Digital Strategy development has been delayed
                                                                                           Disruption
            the foundation for technology requirements and                                               due to changes in key personnel, and resource constraints. It
            digital transformation over the next 5 years.                                                is anticipated that a draft strategy and roadmap will be tabled
                                                                                                         at the June ICT Steering Committee.

Page 28

Initiatives not on Target

OP Ref     Initiative                                         Service/Mgr Responsible    Status       Reason for Status
5.3.2      Commence the review of Local Laws.                 Local Laws Manager         Minor        Councillor Workshop held 1 May 2025 which discussed various
                                                                                         Disruption
                                                                                                      options to proceed with the review. A budget bid has also been
                                                                                                      submitted for consideration. The outcome of the budget
                                                                                                      process will inform the next steps for the local laws review.

5.4.2      Develop a workforce planning model and process     People and Culture         Minor        People and Culture officers attended the LGAQ Workforce
                                                                                         Disruption
           and partner with managers to undertake             Manager                                 Strategy & Planning Forum on 30 October 2024. A draft
           workforce planning.                                                                        Workforce Planning framework will commence being co-
                                                                                                      created with the ELT in Q2 2026.

5.4.5      Complete the negotiation process for Council’s     Chief Executive Officer    Major        Negotiations for the 2025 Certified Agreement are almost
                                                                                         Disruption
           new Certified Agreement which will set out the                                             complete with the wages proposal still in negotiations. A
           conditions of employment                                                                   mediator has been engaged to guide negotiations between
           for Council and the rights and entitlements of                                             Council and the unions.
           Council employees.
5.5.1      Progress the implementation of the corporate       Chief Executive Officer    Minor         Development of the various components of the framework is
                                                                                         Disruption
           performance reporting system, and technology                                                ongoing with the focus now implementing the Corporate
           solutions to risk management                                                                Reporting System. The system has been trialled Q2 FY24/25.
           and governance-related processes.                                                           Following on from this the system and required training has
                                                                                                       been rolled across Council and with the current Q3 update
                                                                                                       entered and reported through the new system module.
                                                                                                       Following further system development, the focus will be on KPI
                                                                                                       reporting.
5.7.1      As part of the development of a Council Revenue    Strategy and Environment   Major        A project scope is nearing completion to investigate various
                                                                                         Disruption
           diversification and Funding Model (to inform the   Director                                funding models including the concept of a futures fund.
           Finance Strategy & Futures Fund) explore
           investment structure frameworks for Place,
           Economic, Social and Climate Resilience
           infrastructure.

Page 29

Initiatives not on Target

OP Ref     Initiative                                     Service/Mgr Responsible    Status       Reason for Status
5.7.2      Finalise the development of the Boreen Point   Strategy and Environment   Major        Consultant engagement and design work for Boreen Point
                                                                                     Disruption
           Campground Master Plan.                        Director                                Campground master planning completed. Project scope is
                                                                                                  currently on hold due to identified challenges in obtaining
                                                                                                  development approval under the current scope and scale.
                                                                                                  Further progression paused pending resolution of planning
                                                                                                  constraints and review of alternative options in 25/26.
5.9.1      Deliver the budgeted Capital Works program     Infrastructure Planning    Minor        Progress on the program is presented in a regular Quarterly
                                                                                     Disruption
           across Shire to budget time and quality        Design & Delivery                       Report to Council, most recently February 2025. As referenced
           expectations.                                  Manager                                 in the quarterly report; resourcing, and rising project costs
                                                                                                  pressures are proving challenging to deliver the program.
                                                                                                  Notwithstanding delivery pressures good progress has been
                                                                                                  made on delivery, and considerable work undertaken to
                                                                                                  contain project costs

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.