5.2 Water quality reaction plan
Water quality Low High Emergency Plan
Parameter setpoint setpoint
PH 7.8 8.2 Manually test and adjust with
Hydrated lime to increase PH or
Hydrochloric Acid to decrease PH
Ammonia (TAN) N/A 1ppm Inspect grow tanks for dead fish
Inspect Bio filter for correct
operation.
Reduce feed rate equal to the date
of last acceptable ammonia test.
Increase feed rate at slower rate to
allow bio filter bacteria to grow. If
ammonia levels increase to high
levels ensure there is enough bio
media in bio filter.
Nitrite NO2 N/A 1ppm Check De nitrification tank for
correst dosing of carbon donor and
ORP level correct to ensure there
is no nitrite build up in de
nitrification tank outlet.
Inspect Bio filter for correct
operation.
Reduce feed rate equal to the date
of last acceptable ammonia test.
Increase feed rate at slower rate to
allow bio filter bacteria to grow. If
ammonia levels increase to high
levels ensure there is enough bio
media in bio filter.
Nitrate NO3 N/A 200ppm Check denitrification for correct
operation. Check for correct ORP
reading. Ensure at 3% of system
water is being discharged.
Decrease feed rate until solution is
found.
ORP (Outlet of +300mv +350mv If below 300mv check ozone
protein skimmer to generator for correct operation
control ozone including ORP Probe. Check
output) oxygen generator that produces
oxygen for the ozone generator.
If above 350mv turn ozone
generator off immediately. Check
ORP probe and recalibrate then
turn on ozone generator and
monitor for correct operation.
ORP (de nitrifying -50mv +50mv If below -50mv check dosing pump
tank to control for correct operation and check
carbon donor Nitrite levels in system water to
dosing) ensure nitrite levels are not at high
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 3 - Site Based Management.pdfRelated documentApplication case desk ↗
About this file
- File size
- 325 KB (small file)
- File type
No other editions are linked here.