ITEM NO.                                                  DESCRIPTION                                                   UNIT QUANTITY              RATE            TOTAL
                               SECTION 5 : EROSION AND SEDIMENT CONTROL WORKS

    5.1        Hydromulching to areas as indicated on design drawings inc establishment until on-
               maintenance                                                                                               m2         2512          14.90       $ 37,430.33


    5.2        Supply and install Sediment Fencing and Spill Through Weirs complete (As Required) Lump
               in accordance with design drawings                                                                                                             $ 12,000.00
                                                                                                   Sum

    5.3        Supply and Place Gully Inlet protection complete, in accordance with design drawings
                                                                                                                         No           4           293.40       $    1,173.60


    5.4        Supply and install Sand Bag Check Dams complete, in accordance with design
                                                                                                                         No.          3           234.80       $      704.40
               drawings


    5.6        Supply and place construction entry/exit grate complete, in acordance with design
                                                                                                                         No           1          5,246.70      $    5,246.70
               drawings.



                                                 TOTAL SECTION 5
                                                                                                                                                              $ 56,555.03
                                       EROSION AND SEDIMENT CONTROL WORKS

QUANTITIES ILLUSTRATED HEREIN ARE ESTIMATES FOR TENDERERS INFORMATION ONLY. TENDERERS ARE REMINDED THAT THIS IS A LUMP SUM CONTRACT AND ALL QUANTITIES MUST BE CONFIRMED BY THE
                                                                     TENDERER IN THEIR TENDER SUBMISSION.




                                                                                  Page 6 of 6                         STP24-0253 Estimate of Costs-Site Civil Works-Rev A.xls

Used in these records

About this file

File size
122 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Bill of Quantities.pdf · 122 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.