Bill of Quantities · OPW24/0125

of 6

Text shows just the words. Original shows the document exactly as it was published.

ITEM NO.                                              DESCRIPTION                                                       UNIT QUANTITY              RATE            TOTAL
                                          SECTION 4 : STORMWATER DRAINAGE

    4.1        Supply, lay and joint BlackMAX PE pipes, including trench excavation, bedding and
               surround sand, backfill, compaction and disposal of spoil as specified:-
               (a) 600mm dia                                                                                             m           23           360.70      $ 8,156.51
               (b) 750mm dia                                                                                             m           36           432.90      $ 15,584.40

    4.2        Construct Grated Field Inlet pits grate cover and surround to existing pit as per design
               drawings complete
               (a) 600x600                                                                                               No           1          6,112.00      $    6,112.00
               (c) 900x900                                                                                               No           1          7,640.00      $    7,640.00

    4.3        Supply and install Humeceptor STC-3 GPT complete in accordance with design
               drawings and suppliers specifications                                                                     No           1         25,000.00     $ 25,000.00


    4.4        Modifications to existing inlet pits complete in accordance with design drawings                          No           2          3,820.00      $    7,640.00

    4.5        Modifications to exisitng access chambers complete in accordance with design
               drawings                                                                                                  No           1          4,584.00      $    4,584.00


    4.6        Modifications to existing outlet structures in accordance with design drawings                            No           1          5,500.80      $    5,500.80

    4.7        Supply and install precast concrete headwall to stormwater outlet complete
               (a) 600mm dia                                                                                             No           1          1,875.80      $    1,875.80



                                                     TOTAL SECTION 4
                                                                                                                                                              $ 58,352.60
                                                  STORMWATER DRAINAGE

QUANTITIES ILLUSTRATED HEREIN ARE ESTIMATES FOR TENDERERS INFORMATION ONLY. TENDERERS ARE REMINDED THAT THIS IS A LUMP SUM CONTRACT AND ALL QUANTITIES MUST BE CONFIRMED BY THE
                                                                     TENDERER IN THEIR TENDER SUBMISSION.




                                                                                  Page 5 of 6                         STP24-0253 Estimate of Costs-Site Civil Works-Rev A.xls

Used in these records

About this file

File size
122 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Bill of Quantities.pdf · 122 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.