Skip to the record
Accept no imitations.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 175, section 1. The text section number identifies this passage in the reader.

ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT                                                 1-2
                               other requirements arising from legislation and other approvals
                               -        How the performance targets are to be achieved
                               -        When the performance targets will be satisfied
                               -        How the performance will be monitored
                               -        Corrective actions and contingency measures to be undertaken
                               -        Reporting Arrangements (including monthly reports to Council
                                        during construction)
                               -        Auditing Arrangements
                               -        How the requirements are to be incorporated into the
                                        construction and works contracts.
                               -        How the developers, employees, contractors and contractors
                                        employees will be informed and trained with respect to the
                                        environmental protection requirements
                               -        Enforcement; and
                               -        Penalties for non compliance

              75      The EMP shall apply to all works and activities on all areas of the site and
                      adjacent road reserves (eg. All development, jetty construction1 and
                      operation,etc.)
              76      In particular, but without limitation, the EMP shall address the following issues in
                      relation to the construction and operational phases of the development:
                          ● Legislative compliance
                          ● Vegetation protection
                          ● Fauna and Fauna Habitat Protection
                          ● Aquatic ecosystem protection
                          ● Weed control
                          ● Pest control (particularly mosquitoes)
                          ● Soil erosion and sediment control
                          ● Water Quality Protection
                          ● Storage and Handling of Hazardous Substances
                          ● Waste Management
                          ● Bushfire Control

              77      The EMP shall incorporate the requirement for monthly compliance monitoring
                      and annual audit reports to be submitted to Council for the construction stages
                      of the development. The format and content of these reports shall be in hard
                      copy and digital form, generally in accordance with the following:

                      77.1          Include tables of the monitoring results (digital form should be in
                      Excel).
                      77.2           Include individual charts plotting the results for all parameters
                      required in the monitoring.
                      77.3       Include a brief written discussion of the results and recommend any
                      necessary actions.
              78      The Applicant and all future owners of the site shall comply with the EMP.




1
    Jetty is now to be a separate application and EMP


             S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.