ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT 1-3
1.2 Relationship to other Management Plans
Conditions for the application require that a number of Management Plans are required to support the
application. These plans are as follows:
• Environmental Management Plan (this plan).
• Ecological Restoration Plan and Specifications
• Fauna Management Plan.
• Landscape Master Plan.
• Fire Management Plan.
• Construction Management Plan (including Traffic Management Plan).
• Sediment and Erosion Control and Stormwater and Water Quality Management Plan.
• Acid Sulphate Soils Management Plan.
Components of each of the above plans are relevant to the implementation of this EMP and, in most
cases, have been incorporated into the document where appropriate. However, there will be
components of the plans identified above that have not been integrated into this EMP. In such cases,
it will be necessary to refer to the original plan noted above for greater detail regarding management
procedures and methods of implementation (this will be cross-referenced in this document). The
Ecological Restoration Plan and Specifications is the key reference document and provides the basis
for day-to-day activities during the ERP program.
As noted in Section 1.1, three EMP’s have been prepared for the total property with EMP3 covering
all ecological restoration works to be undertaken on all portions of the property not covered by EMP
1 and 2. These areas are indicated on Figure 1-1. EMP 3 thus addresses those works to be undertaken
by the proponent, Settlers Cove Development Pty Ltd and shown on Figure 1-1 up until the following
occur:
1. The RF Thompson Environmental Park land is deeded to the proposed Environmental
Organisation administered by Council in accordance with the Deed for transfer of the
Environmental Park and until the end of the four year maintenance period;
2. The Public Esplanade is transferred to Council/Environmental Organisation and until the end of
the four year maintenance period;
3. The four year maintenance period for the Park is complete. This excludes the proposed
stormwater treatment wetland which Council will maintain following its construction;
4. The POSCWP Areas are transferred to the individual Bodies Corporate where they are part of the
RHD lots. The four year maintenance period for ecological restoration works applies to both the
proponent and bodies corporate (upon sale of the individual lots) following practical completion.
Outstanding works in the POSCWP areas can be bonded;
5. The individual RSL lots (incorporating the POSCWP areas) are sold. Ecological restoration areas
will then be maintained by the private lot owner within their holding;
S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.