Skip to the record
Every meeting, every word.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 199, section 1. The text section number identifies this passage in the reader.

ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT                                            5-2
        •    survey (if necessary) and map the locations of noteworthy species and keep a photographic
             record;
        •    develop and undertake monitoring programs, and, if appropriate, research projects which provide
             a sound basis for development management practices;
        •    continue ecological enhancement measures to further the works undertaken as part of the ERP;
        •    if necessary, conduct fauna surveys in the wet and dry seasons;
        •    prepare and implement a feral animal control program which targets particular introduced
             species.

5.3     Weed Management

        The following should be undertaken:
        •    develop a short term weed action plan with a strategy of containment with eradication of isolated
             outbreaks;
        •    develop a long term weed action plan which includes:
              identifying, mapping and recommending control priorities and assessing control methods
               (refer weed management sections of other EMPs and ERP);
              weeding activities which promote natural regeneration, prevent reinfestation and take into
               consideration potential environmental impacts such as proximity to Weyba Creek / Noosa
               Inlet;
              identifying and controlling any new weed species and / or outbreaks;
              if appropriate, liaise with local landholders and involve volunteers and local community
               groups in weed control; and
              developing and implementing a program for the collation and propagation of indigenous
               seed for use in rehabilitation projects on the land and by local landholders.

5.4     Fire Management

        The following will need to be undertaken:
        •    develop a fire management plan as part of the CMP, including action and response directives.
             This plan is to be compatible with the Fire Management Plan prepared for the Settlers Cove
             development;
        •    confirm risk areas (including potential areas of threat to adjacent properties in the RSL and RHD
             areas);
        •    liaise with the QFRS and landholders regarding co-ordinated fire management strategies; and
        •    as required, develop and implement a program of fuel load control , primarily through hand
             removal.




        S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.