INTRODUCTION 1-4
6. The Road Reserve- Bushland will be subject to a 12 month maintenance period following
practical completion whereupon Council will then take responsibility for maintenance.
The above is described in further detail in the Ecological Restoration Plan which describes the
specific nature of works to be undertaken and the performance criteria that will need to be met. As
indicated Figure 1-1, there are a number of areas, including the Road Reserve – Bushland, sewer
corridors and public pathway where there will be engineering/infrastructure work areas initially
covered by either EMP 1 or 2 that will, on their completion, be covered by EMP 3 in regard to
ecological restoration works.
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.