INTRODUCTION 1-5
LEGEND
Residential High Density (RHD)
Building Envelope
Residential Single Lots (RSL)
Building Envelope
Road Reserve - Bushland
Road Reserve - Landscaped
Road Reserve - Constructed Road
Environmental Park
e ek
Cr Public Esplanade
Park
Weyba
Private Open Space for
HAT Conservation & Waterways Protection (POSCWP)
R L=0.6
3
Artificial Wetland within park area (refer text)
EMP Boundaries*
EMP 1 Boundary - Construction (RHD Area)
EMP 2 Boundary - Construction (RSL Area)
EMP 3 Boundary (Ecological Restoration Work)
EMP 1 and 3 - Areas of engineering/service
No infrastructure followed by ecological restoration work.
os
LOT 600 a
EMP 2 and 3 - Areas of engineering/service
HA
R F THOMPSON T RL
infrastructure followed by ecological restoration work.
=0
ENVIRONMENTAL PARK .6 3
7
In
l et
6
8
5
9
4
23 22 21 20 19 10
18
17
24
16
25 3
Serenity
26
27 28 29 30 31 15
32
33
Close
14 13
No o 12
11 11
sa 10 9 8 7
6 5 4
3
2
Driv
e 1
Access
Access to
to Lots
Lots 11 -- 13
13 included
included in
in EMP
EMP 22 50
50 00 50
50 100m
100m
* Boundaries are indicative. Specific boundaries should
be checked in Tate Professional Engineers Plans and Approx.
Approx. Scale
Scale
Ken Hicks & Associates Plan No 1128 - Master.
EMP Boundaries - Construction Phase * Figure 1.1
I:\B15184_I_JLB Settlers Cove DAH\DRG\LOC_001_EMP_Boundaries_Construction Phase_050721.WOR
OCEANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.