Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 218, section 1. The text section number identifies this passage in the reader.

INTRODUCTION                                                                                             1-6

        A Conservation Management Plan (CMP) will be jointly prepared by Council and Settlers Cove
        Development Pty Ltd for the RF Thompson Environmental Park in accordance with the Deed.
        Similarly, it is expected that Council will establish management strategies for the Public Esplanade
        and public Park lands (including the construction of a stormwater treatment wetland).

        Figure 1-2 indicates the management boundaries for the various components of the total property area
        for the operational phase of the project area. As indicated in this figure, the Operational section of
        this EMP (Chapter 5) addresses the area indicated as being managed by the bodies corporate within
        the RHD lots.




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.