SARA RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 224, section 1. The text section number identifies this passage in the reader.
INTRODUCTION 1-12
Details of all contractors proposed to be working at the site during the construction program are to be
provided to the Council prior to the Pre-start meeting for approval by the Manager – Land
Development (this is in accordance with Council Operational Works approvals).
1.5 Training Requirement
The Developer is responsible for ensuring that the Principal Contractor meets the contractual
specifications for adequate training to be provided to all members of the construction team involved
in the Settlers Cove Project. This responsibility for training can be devolved to the SEO who should
liaise with the Project Manager and other relevant agencies to ensure current interpretations of the
EMP are appropriate.
As a minimum, all contractors and sub contractors and their staff will be required to undergo a Site
Induction, incorporating environmental awareness training, prior to being allowed to work on the site.
The induction will detail the site’s environmental values and highlight the relevant requirements of
this EMP and Management Plans. The Induction Training program is to be approved by Council prior
to implementation.
A key component of the Site Induction and Environmental Awareness training will be application of
the Site Management Rules that will apply to all contractors, sub-contractors and others working on
the site.
Appendix B presents the Site Management Rules that will be presented to each attendee. Each
attendee will be required to sign the form (also see Appendix B) acknowledging that they have read,
understood and will comply with the Site Management Rules. These signed forms will be retained by
the Principal Contractor and will be available for inspection by Council at any time. Personnel
trained are to retain a copy for their records. Anyone in breach of the Rules will be directed by the
Principal Contractor to rectify the breach. A significant breach may necessitate exclusion of the
offender from the site.
1.6 Performance Criteria and Guidelines
In this document, performance criteria are expressed in simple terms that can be readily understood
and measured, and provide a sound basis for corrective action. Where possible they are set against
established legislative or quantitative standards. Legislation, policies and conditions of approval
applicable to the construction of the Settlers Cove Development have been indicated with each
element.
The following guidelines are applicable to the construction of the Settlers Cove Development.
Air Quality Guidelines Users Guide to Queensland’s Applies to construction phase
Environmental Protection (Air) for the control of dust
Policy 1997, Department of emissions.
Environment and Heritage.
Noise Guidelines Users Guide to Queensland’s Applies to the construction
Environmental Protection phase for the control of noise
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.