Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 298, section 1. The text section number identifies this passage in the reader.

 

 

LOCATION OF NATURAL
J wisp 3 a ERR ows

 
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       
     
       

 

 

 
  
  

 
  

 

 

 

     

   

 

 

   

SSR =
OINTS
IPMP 5 RESPREAD TOPSOIL, LEAF
UTTER & HUKUS TO
SCREN CAP FEPLCATE NATURAL
CONDITIONS:
Ke—1500 uPVC PIPE
=| 3 41206 NET HOLES
=| WRAPPED IN CEOFABRIC
/
np | a
‘VISQUEEN VAPOUR BARRIER
el . TAPE TO PIPE
4 "4x208 OVERFLOW HOLES
NATURAL INFILTRATION SAMPLING PIT (NISP
SCALE 1:20
1. ALL TOPSOL, LEAF LITTER & HUMUS TO BE CAREFULLY STRIPPED AND SET ASDE PRIOR
TO EXCAVATION,
2, BACKFILL TO BE LIGHTLY COMPACTED TO REPLICATE NATURAL CONDITIONS.
‘3. TOPSOIL LEAF LITTER & HUMUS TO BE CAREFULLY RESPREAD TO REPLICATE NATURAL CONDITIONS
4, LOCATIONS To BE CONFRNED OW SITE TO AVOID SIOMIFICANT VEGETATION CISTURGANCE.
900eq GALVANISED GRATE
AK WITH 2/12 §/5 BOLTS.
FSL
a feed EY 3
§ Z Lp Freeast CCONORETE UD
—
PROVIDE. 10mm DIA
o ed ae HOLE
‘
BDK Al4 CEOFABRIC="]
FALTER FLX HTH S\$ q
SELF TAPPING SORE
300
300 X 500 STAINLESS STEEL
TRAY, FAK TO WAL OF PIT 500
‘WTH 2/810 S\S TRUBOLTS
y
1380 gl
Z|
REINFORCED CONCRETE PIPE——-—}
* pear
PROVIDE THREE (3) INFILTRATION 3 ROCK SPALLS,
PIT MONITORING POINTS (IPMP’s) Tee be —k
TO SINGLE LOT RESIDENTIAL Eanm BASALT ROCKSPALLS a
jm
DEVELOPENT AREA WeAPFED A Ae —
INFILTRATION PIT MONITORING POINT (1PMP) DETAIL
SCALE 1:20
DRAWING STATUS Design: SH TATE PROFESSIONAL ENGINEERS PTY LTD J PROVECT: BRAWING TITLE:
NOT FOR CONSTRUCTION Drawn: 1 ABN. 28 086 262 035 SETTLERS COVE WATER QUALITY MONITORING PLAN
Date: NOV 04 4 The Esplanade, Maroochydore SHEET 1 OF 2
PRELIMINARY J checked: s4 . vee 0 S58 at BANKSIA AV NOOSA Revision | Sheet
OATE: 03.11.04 Datum: AHD FAG. [email protected] ’ DRAWING No: (1636/04/WOM1 lo t
Scale: 1500 PROFESSIONAL ENGINEERS web: ntip://www.tatenetoa — [for RF THOMPSON PTY LTD Fan Fd operas he pg of dle Be guns pond neo
botnet eee e ee TV Rek ceping. recordlag or otherwise} be eaproductd, sored a talsee)ayscms a trmamnen rite tae peor
REV | DATE DESCRIPTION BY |CHKD DIRECTOR APPROVAL Ai SHEET SIZE Council ef: wnlten percuisslon of Tete Professionel Engineers, gil enquiries should ba directed ta Tals Professions) Engineers.

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.