Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 299, section 1. The text section number identifies this passage in the reader.

 

 

LOCATION OF NATURAL
INFILTRATION SAMPLING PGINT

LOCATION OF INFILTRATION
PIT MONITORING POINTS
IPMIP 5

   

2000

 

‘SCREW CAP

RESPREAD TOPSOIL, LEAF
LITTER & HUMUS To
REPLICATE NATURAL
CONDITIONS:

 

 

 

 

800

K—1500 uO PPE

4x208 iNLET HOLES
WRAPPED IN GEOFABRIC

 

 

TAPE TO PIPE
4x208 OVERFLOW HOLES

 

 

NATURAL INFILTRATION SAMPLING PIT (NISP

SCALE 1:20

NOTES

 

1, ALL TOPSOL, LEAF LITTER & HUMUS TO BE CAREFULLY STRIPPED AHO SET ASIOE PRIOR

TO EXCAVATION.

2. BACKFLLL 10 BE LIGHTLY CONPACTED TO REPLICATE NATURAL CONDITIONS,
‘3. TOPSOL LEAF LITTER & HUMUS TO GE CAREFULLY RESPREAD TO REPLICATE NATURAL CONDITIONS
4, LOCATIONS TO BE CONFIRNED ON SITE TO AVOID SIGNIFICANT VEGETATION DISTURBANCE.

900sq GALVANISED GRATE
FIX WITH 2/12 S/S BOLTS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
   
     
 

 

     
   
      
   

Email: [email protected]

Scale: 1 Web: http: //www.tatenetau

PROFESSIONAL ENGINEERS for RF THOMPSON PTY LTD

   

 

 

DIRECTOR APPROVAL

 

 

 

 

 

 

REV | DATE DESCRIPTION CHKD

   

Al SHEET SIZE

 

FAR -
g g
i Precast CORORETE LD
(ae aa
Rutonge | - 12
‘SELF TAPPING SCREWS
300
300 X 300 STAINLESS STEEL’
TRAY. FIX TO WALL OF PIT 500
(WTR 2/MI0 S\S TRUBOLTS
3
1350 g
|
REINFORCED CONCRETE PiPE-——}
3 REMOVABLE GIDIM AI4
i tet
é _*
SKE PROVIDE THREE (3) INFILTRATION rom BASALT ROEM A
PIT MONITORING POINTS (IPMP’s) re SCE
TO HIGH DENSITY RESIDENTIAL
DEVELOPENT AREA INFILTRATION PIT MONITORING POINT (IPMP) DETAIL
SCALE 1:20
BRAWING STATUS ign: PROFESSIONA PROJECT: DRAWING TITLE:
NOT FOR CONSTRUCTION ean > er 28 086 oe oe Pvp SETTLERS COVE WATER QUALITY MONITORING PLAN
PRELIMINARY | cnecket 3t Po Bor 2, Mrccpso, , S88 SHEET 2 OF 2
OnE O04 Setar: tt or seis 250 Poe (7) sas 72g at BANKSIA AV, NOOSA: ORANG ne: GI636/04/WOMD | RRR Shan

 

 

1 of

t

 

 

Council Ref:

in any form or By any means {electronic mechanical
duced, sinred in a reireral eystem or

‘© Tole plan fe Copyright Other wan for the purposes of and subject to the conditions prescribed under the
Copyright det, mo pert-af it
copying, recording or olberrise) be

; icra copying, photo
m
arilten permisrioa of Tate Professional Engineers. All enguitiea should be divactad to Tele Professional Engineer

tramamitted without the

 

‘prior

 

 

 
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.