Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 317, section 1. The text section number identifies this passage in the reader.

SETTLERS COVE NOOSA
Landscape Master Plan

 

ma me ae ee ee

9. PLANTING OUT PROCEDURES AND HORTICULTURAL REQUIREMENTS

Horticultural industry best practice shall be employed throughout all stages of
landscaping and detailed landscaping specifications are to be provided at the
operational works phase of application.

To ensure greater success in establishment and long term sustainability of proposed
landscapes correct planting procedures are essential. Noosa’s Landscaping Guidelines
provide guidance for the construction of planting areas and installation of plants. On site
landscape works in the High Density Residential Building Envelopes and Road Reserve
- Landscaped areas shall generally comply with their planting recommendations but
should also incorporate site specific guidelines provided from local Landcare and or
Catchment Care Groups.

The selected planting size will vary depending upon the desired location, specific
environmental conditions, function within the landscape, and availability of plant species.
Noosa’s landscaping guidelines suggest as a general guide the following minimum pot
sizes:

 

 

 

 

 

 

 

Form of Plant Minimum Pot Size
Street and feature trees 45 — 100 litre
Trees generally 15 - 25 litre

Tall, stow growing or feature shrubs 200mm

Shrubs generally 150mm

Ground covers, climbers and tufted Tubestock -140mm
plants

 

 

 

Note: Compliant with conditions of approval (High Density Residential Building
Envelopes) more advanced (25litre — 45litre stock) are required in buffer areas
between buildings and the lots front boundary to the Road Reserve.

In some applications, especially with deep rooting native species, it is better to use
tubestock for ensuring long term success. These selections as with all others will require
approval from Counciis Manager Land Use or nominated officer.

 

LandGraphics Maroochydore 04.05.2005
Landscape Architects and Environmental Planners PAGE 17
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.