Original source · versioned page text
SARA RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 82, section 1. The text section number identifies this passage in the reader.
2008/176
97. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
98. The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Refuse
99. The developer shall provide waste and recycling storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”. The Waste Management Plan of Mark Rigby and Associates dated
February 2009 is not approved in its entirety. An amended Waste and Recycling Management
Plan (Operational) must be submitted for the day-to-day operation of the development and
approved by Council’s Waste and Resources Management Branch prior to issue of
development permit for operational works. The amended plan shall include amongst other
things –
a. Further details of the waste and recycling collection area on the south side of Building A
to show:
i. Full dimensions of the overall area and its likely increase in size to accommodate
the required bins.
ii. The number and types of bins stored there.
iii. The vehicle movement paths of the different general refuse and recycling vehicles
which must comply with the turning circles of AUSTROADS: design single unit
truck/bus (12.5m) template. This must allow easy and safe collection for both front
and rear loading and allow the required height clearance.
b. The nine waste and recycling storage areas throughout the resort and residential
buildings and the external waste and recycling collection storage area are all to be
provided with their own individual bin washing facilities.
c. The waste and recycling storage areas shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste,
paper/cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc.
d. The proposed separate refuse chutes (general refuse and recyclables) must be provided
in accordance with Council’s Policy for “Refuse Chutes and Accessories in Multi Storey
Buildings”. The recyclable chutes in Buildings A – C are to be used in the same way as
Buildings D – G.
100. A Construction Waste Management Plan shall be submitted and approved by Council’s Waste
and Resources Management Branch prior to issue of a development permit for operational
works. Waste Management Plans are required to be in accordance with Planning Scheme
Policy 11, Waste Management Plans see table below. Waste storage areas are to provide for
adequate separation of all reusable, recyclable and waste materials. These shall be located
so that they are convenient and safe to use (refer to Noosa Council Waste Management
Code).
The Plan shall contain the following information:
a. The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
b. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
Page 12 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.