2008/176
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify contractor
materials volume *specify proposed *specify contractor and landfill site or
(m³) re-use or on-site and recycling outlet other disposal site
recycling methods
Excavation material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
Trade Waste
101. The drainage system from all business that are likely to discharge trade waste must comply
with Council’s Trade Waste Policy and Sunshine Water’s guidelines for accepting trade waste
into the sewer. All appropriate trade waste permit and/or agreements must be applied for and
issued prior to the discharge of any trade waste to the sewer.
102. Noise emission from mechanical equipment shall comply with the following requirements:
Air-conditioning and Refrigeration
a. 7am to 10pm: Maximum background + 5dB(A)
b. 10pm to 7am: Maximum background + 3dB(A)
Pumps
c. 7am to 7pm: Maximum background + 5dB(A)
d. 7pm to 10pm: Maximum background + 3dB(A)
e. 10pm to 7am: No audible noise.
103. Written certification from a suitably qualified person shall be submitted confirming that the
noise levels from all mechanical equipment comply when measured at either the residential
boundary or outside the most exposed part of an affected building, whichever is the closest to
the equipment.
The assessment and certification is required immediately after installation of the equipment
and prior to any occupation of the building, and in a format approved by Council. All
equipment should be operating at the same time to test the overall noise level created.
Note: It is highly recommended that the person you engage to certify the installation is
involved at the plan development stage so they can recommend where this equipment is best
located. They can also advise about noise enclosures and can make other suggestions to
avoid noise problems. It is a lot more costly to try and deal with noise problems after
everything is built.
Page 13 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.