Original source · versioned page text
18164 - SBSMP - Rev 0
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Page 2
Table of Contents
1 INTRODUCTION .......................................................................................... 3
2 GENERAL .................................................................................................. 3
3 RESPONSIBILITY FOR INSPECTION ..................................................................... 3
4 DATA COLLECTION / STORAGE REQUIREMENTS ..................................................... 3
5 MAINTENANCE PROCEDURE............................................................................. 3
5.1 General .............................................................................................. 3
5.2 Inspections .......................................................................................... 4
5.3 Watering ............................................................................................ 5
5.4 Vegetation Management and Weed Control .................................................... 6
5.5 Validation Water Quality Testing ................................................................ 6
5.6 Equipment Needs .................................................................................. 6
5.7 Occupational Health and Safety ................................................................. 6
5.8 Public Safety ........................................................................................ 7
5.9 Disposal Requirements ............................................................................ 7
5.10 Access Issues ........................................................................................ 7
5.11 Bio-Retention Basin Resetting .................................................................... 7
Appendix A BIO-RETENTION BASIN MAINTENANCE CHECKLIST ..................................... 8
Bio-Retention Basin Operational Management and Maintenance Guideline
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.