18164 - SBSMP - Rev 0
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Page 6 5.4 Vegetation Management and Weed Control Conventional surface mulching of the bio-retention basins with organic material like tanbark, should not be undertaken. Most organic mulch floats and runoff typically causes this material to be washed away with a risk of blocking drains. If weeds are observed within the bio-retention basin they shall be removed. Weeding will generally involve manual removal of the species. Vegetation planting densities are to be in accordance with the Landscape Architect’s design. Where necessary a biodegradable erosion mat can be applied the basin batters to help combat weed invasion and reduce the labour intensive maintenance requirements for weed removal. Herbicides are not recommended as a means of weed control. If required, however, their application is to be managed to avoid unintentional destruction of other vegetation or the introduction of chemicals that may contaminate the stormwater runoff. Where necessary, in areas that have been extensively weeded, the bio-retention basin shall be replanted with similar planting densities using suitable native species in accordance with the Landscape Architects design. Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall be removed and replaced with suitable native species in accordance with the Landscape Architects design. The removal of plants, dead or diseased vegetation or weeds shall be disposed offsite at an appropriate waste management facility. All litter and debris present on the surface or batters of the bio-retention basins shall be removed and disposed offsite at an appropriate waste management facility. 5.5 Validation Water Quality Testing Validation water quality testing is not proposed for the site. 5.6 Equipment Needs The equipment required to undertake regular maintenance to the bio-retention basins will be standard hand held landscaping tools. No specific mechanical equipment is expected to be required for the maintenance of the basins unless resetting is required (refer Section 5.11). 5.7 Occupational Health and Safety The maintenance activities are to be undertaken in accordance with all current occupational and workplace health and safety legislation, regulations, codes of practice or manufacturers guidelines. Bio-Retention Basin Operational Management and Maintenance Guideline
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.