Original source · versioned page text
18164 - SBSMP - Rev 0
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Water By Design Bio-Retention Basin Design Checklist Job No.: 18164 Address: 215 David Low Way, Peregian Beach Development: Proposed Reconfiguration of a Lot and Mixed Used Development Date: 26/11/2019 Author: DY Checked: CG Item Description Detail Comment 1. Treatment a. Catchment area (ha) 1.2046 b. Filter media area (excluding batters) (m2) 130 c. Confirm water quality performance meets the Yes design objectives d. Confirm hydrologic performance meets relevant Yes frequent flow objectives 2. Design Inflows a. Minor design storm entering system Q3month b. Minor storm peak flow rate (m3/s) 0.140 c. High flow pipes from the internal drainage network Major design storm entering system N/A directed to detention tank. d. Major storm peak flow rate (m3/s) N/A 3. Depth Profile a. Refer to Drawing No.'s 18164/C10 - 18164/C24 Bioretention drainage profile type Type 2 prepared by Morgan Consulting Engineers. b. Minimum drainage layer depth (mm) 200 Refer comment 3a. c. Maximum drainage layer depth (mm) 248 Refer comment 3a. d. Transition layer depth (mm) 100 Refer comment 3a. e. Saturated zone depth for Type 1 bioretention N/A systems f. Filter media layer depth (mm) 400 Refer comment 3a. g. Extended detention depth (mm) 200 Refer comment 3a. h. Maximum water level depth above extended 600 detention for major storm event (mm) i. Freeboard to top of embankment (mm) 200 j. Total system profile depth (3c+3d+3f+3g+3h+3i) 1748 (mm) k. Liner type - (i) Permeable, (ii) Impermeable, (ii) Impermeable Refer comment 3a. None to base l. AASS/PASS assessed and appropriately managed N/A m. Presence of dispersive soils assessed and N/A appropriately managed 4. Design Levels a. Outlet invert level (m AHD) 2.420 Refer comment 3a. b. Overflow pit invert level (m AHD) 2.452 Refer comment 3a. c. Minimum drainage layer level (m AHD) 2.452 Refer comment 3a. d. Filter media surface level (m AHD) 3.200 Refer comment 3a. e. Overflow pit crest level (m AHD) 3.400 Refer comment 3a. f. Overflow weir level (m AHD) N/A Refer comment 2c. g. Maximum design water level (m AHD) 4.000 Refer comment 3a. h. Top of embankment/batter level (m AHD) 4.200 Refer comment 3a. i. Inlet/inflow invert level (m AHD) 3.300 Minimum IL of inlets. Refer comment 3a. j. Total level difference (m) 1.748 k. Highest astronomical tide level (m AHD) N/A l. Groundwater level (m AHD) N/A 5. Layout a. Maximum filter media length (m) 20.45 b. Maximum filter media width (m) 6.9 c. Maximum batter slope (V:H) 1:3 Refer comment 3a. d. Maximum wall height (m) 0.800 Height above filter media surface e. Provision for services N/A f. Private bioretention basin. Shallow depth. Access Maintenance access provided N/A provided via internal driveway. 26-11-19 - 18164 - Bio det basin design checklist Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.