Skip to the record
Every meeting, every word.

Original source · versioned page text

Minor Change Council Report 51988.2770.02

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (10.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

               PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT                             10 SEPTEMBER 2024


               30.    All building materials containing asbestos, including asbestos cement sheeting or roofing and
                      lagging, are removed from the building prior to demolition or relocation.
               31.    Removal of building materials containing asbestos must be undertaken by a licensed
                      asbestos removalist.
               32.    A waste management plan, in accordance with the requirements of Planning Scheme Policy
                      PSP9 Waste Management, is to be provided to Council for approval prior to the issue of the
                      development permit for building works.
               33.    Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
                      solutions as contained in the Waste Management Code and Water Quality and Drainage
                      Code of the Noosa Plan.
               34.    Adequate area must be provided on-site for the collection and separate storage of recyclable,
                      non-recyclable, vegetative and hazardous materials in their specific waste streams during
                      removal or demolition works.
               35.    All waste materials must be removed from the site to avoid causing unhealthy conditions,
                      with the site left clean, tidy and free from any debris.
               36.    Where a development permit has not been issued for the future use of the site, hard surfaced
                      areas including concrete slabs must be removed and disturbed areas must be revegetated
                      in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
                      be turfed within 20 business days of completing the removal or demolition work.
               37.    Erosion and sediment control is to be undertaken in accordance with the requirements of the
                      Water Quality and Drainage Code of the Noosa Plan. Measures are to be installed and/or
                      maintained until soils are stabilised by vegetation or sealed.
                      NOTE: It is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).




                                                                                                     Page 5 of 17

Document Set ID: 23198392
Version: 8, Version Date: 28/08/2024
Log in to download the original file

Minor Change Council Report 51988.2770.02.pdf · 10.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.