PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 SEPTEMBER 2024
ATTACHMENT 2 – (51988.2770.02) – ADVISORY NOTES
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Demolition
1. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2018 and the Environmental Protection
Regulation 2019.
NOTE: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
businesses that transport asbestos waste, and landfills that accept this waste.
2. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
3. The ‘Plumbing and Drainage Regulation 2019’ states that at demolition or removal of a
building requires the existing sanitary drain upstream from the connection point for a service
provider’s sewerage system must be sealed water tight. This work is deemed as Notifiable
Work and must be carried out by a suitably licenced plumber who shall submit an As
Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
4. The ‘Plumbing and Drainage Regulation 2019’ states work necessary for installing, replacing
or removing a testable backflow prevention device is included work for Notifiable Work.
Removal must be carried out by a suitably licenced plumber who shall submit a Form 9
(Registration & Report on Inspection and Testing of Backflow Prevention Devices) and Form
4 (Notifiable Works Form) to the QBCC (Queensland Building Construction Commission)
within 10 days of completing the work. Notification to Council once works and document
submission is complete allows removal of backflow prevention devices from Council’s
backflow register.
5. All activities associated with the removal or demolition must be contained within the property
boundaries at all times with site gateways opening inwards and at approved locations only.
If the works cannot be contained within the site, a road and footpath permit must be applied
for.
Page 6 of 17
Document Set ID: 23198392
Version: 8, Version Date: 28/08/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.