Stage 1 Request to Extend Relevant Period

Attached to the e-mail 132007.742.05 Request to Extend Relevant Period (Stage 1).

of 5
            Our ref: PL3420
            Council Ref: 132007.742.04



            11 May 2015


            The Chief Executive Officer
            Noosa Shire Council
            PO Box 141
            TEWANTIN QLD 4565


            Attention:        Development Assessment


            Dear Sir / Madam


            Re:         Request to Extend the Relevant Period of a Development Approval under Section 383 of the
                        Sustainable Planning Act 2009
                        Beach Road Retreats Stage 1 - 30 Beach Road, Noosa North Shore (Lot 2 on SP186169)
                        Council Reference: 132007.742.04


            1. INTRODUCTION


            On behalf of our client, NIT Holdings Pty Ltd, we, Wolter Consulting Group Pty Ltd, under Section 383
            of the Sustainable Planning Act 2009 (SPA), hereby request to extend the relevant period of the
            abovementioned Development Approval granted over land at 30 Beach Road, Noosa North Shore


            We request that the relevant period be extended for 48 months up to and including 13 December
            2019. The facts and circumstances in support of the requested extension are set out in the following
            sections.


            In support of this request, please find attached to this letter the executed Council Form to Request to
            Change or Extend an Existing Approval. Subject to consideration of our representations regarding
            application fees, we kindly ask that Council issue an invoice to NIT Holdings Pty Ltd C/- Wolter
            Consulting Group for the appropriate fee.
            .

BRISBANE
Wolter Consulting Group Pty Ltd   Level 2, 1 Breakfast Creek Rd Newstead Q 4006   P 07 3666 5200   [email protected]
ABN: 61 147 343 084               PO Box 436 New Farm Q 4005                      F 07 3666 5202   wolterconsulting.com.au
DIRECTORS: MICHAEL WOLTER, DONALD MACKIE, ANDREW CRAWFORD, NATALIE RAYMENT

Log in to download the original (Stage 1 Request to Extend Relevant Period.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 4 pages

Page 2

2. BACKGROUND


By way of background, a development approval was issued over the land on 13 December 2007 for a Material
Change of Use for Visitor Accommodation (Type 4) being 21 dwellings, commonly referred to as Beach Road
Retreats Stage 1.


Subsequently the global financial crisis struck in late 2008 and severely impacted the property market, with the
impacts of this crisis prevailing for a lengthy period of time. A Request for Extension to the Relevant Period was
approved and the current lapsing date of the approval is 13 December 2015 (refer Condition 24).


It is considered that the lapsing date of the relevant period for the Material Change of Use is approaching which
is the motivation for this request.


3. REQUEST TO EXTEND RELEVANT PERIOD


Under Section 383 of SPA, an extension to the relevant period of forty-eight (48) months is requested.


Whilst we acknowledge the relevant period is referenced in Condition 24 this request is taken to not be a request
to change the condition for the following reasons:
   Section 3 of the Development Permit concerns the Relevant Period of the Approval, and states that the
    relevant period is set out in the conditions.
   An extension to the ‘Relevant Period’ is required to be made in accordance with s383 of the SPA.
   A previous request was made in accordance with this provision of the SPA and duly accepted and processed
    by Council.


The facts and circumstances in support of the requested extension are as follows:
   A previous extension was initiated by the appointed receivers in order to provide sufficient time for the site to
    be reconciled and properly put to market for sale. For various reasons, this marketing and sale process took
    longer than expected and our client only acquired the site in early 2013.
   Our client has a committed interest in completing the project, and an extension to the relevant period is
    necessary to provide sufficient time to obtain the subsequent approvals necessary to deliver the project.
   Though economic conditions have improved in recent years, visitor accommodation projects maintain a
    reasonably high risk profile, and require ideal market conditions. The requested extension will allow for this
    development to be completed within an acceptable economic and market cycle
   Finally, the proposal remains consistent with the current planning scheme which supports visitor
    accommodation on land in the Visitor Mixed Use Zone.
WOLTER CONSULTING GROUP                                                                                PAGE 2

Page 3

4. ASSESSMENT MANAGER DETERMINATION OF REQUEST


Section 388(1) of SPA sets out the matters to be considered by the assessment manager in determining the
request. These are as follows:


(a) The consistency of the approval, including its conditions, with the current laws and policies applying to the
    development, including, for example, the amount and type of infrastructure contributions, or infrastructure
    charges payable under an infrastructure charges schedule; and
(b) The community’s current awareness of the development approval; and
(c) Whether, if the request were refused-
      (i) further rights to make a submission may be available for a further development application; and
     (ii) the likely extent to which those rights may be exercised; and
(d) The views of any concurrence agency for the approval under section 385.”


The following provides a response to these matters:


Subsection 1(a)


The Development Approval (Council reference: 132007.742.04) was assessed and granted under the provisions
of the Noosa Plan 2006. Since the approval was issued Council has not adopted or commenced a new Noosa
Planning Scheme. We have reviewed the proposal with respect to the existing Noosa Plan and consider that it
remains consistent with the provisions of this current instrument.


Subsection 1(b)


The request to extend the relevant period of the development approval is within the reasonable expectations of
the community as it is currently valid and seeks to facilitate the carrying out of the approval as issued by Council.
This development also remains consistent with the current planning scheme. Furthermore, the site is within a
reasonably lowly populated locality, and the original master plan approval process involved wide consultation with
community and interest groups.


Subsection 1(c)


If this request to extend the relevant period of the development approval was refused, the proponent would be
required to prepare and lodge a new development application which would be subject to impact assessment and
consequently third party appeal rights.

WOLTER CONSULTING GROUP                                                                                PAGE 3

Page 4

However, given that the planning provisions have not altered and simultaneously no changes are proposed to the
approved development, no new submissions would be expected and therefore this would seem an unnecessary
exercise.


Subsection 1(d)


This request requires referral to SARA as the State Government Coordinating agency because the Department
of Environment and Resource Management (DERM) was a Concurrence Agency for the original application. It is
noted that any views of the concurrence agency are to be taken into consideration in the determination of this
request.


5. COUNCIL FEES


In accordance with Council’s fees and charges schedule, the nominated fee an extension to relevant
period is:
   $1,370 for minor matters as determined by Council, and
   $2,303 for more substantial matters as determine by Council.


The proponent has submitted this request contemporaneously with the request to extend the approval for
Beach Road Retreats Stage 2. We are asking that Council agree to one total fee of $2,303 for both
requests on the following basis:
   Both approvals are very similar in terms of content and issues with the primary difference being that
    Stage 1 is a development permit and Stage 2 is a preliminary approval
   The concurrent lodgement allows Council to consider these matters at the same time, and therefore
    provides a resource efficiency
   In the event they had been advanced as one application, the total fee would have been $2,303


We await your consideration and advice regarding total fees payable.




WOLTER CONSULTING GROUP                                                                             PAGE 4

Page 5

6. CONCLUSION


In conclusion, based on the facts and circumstances presented herein, it is recommended that the requested four
(4) year extension to the relevant period be approved by Council. Thank you for your attention to this matter. We
ask that Council now process this request at their earliest convenience and should you have any queries
regarding this matter, please do not hesitate to contact me.


Yours sincerely,
Wolter Consulting Group




…………………………………..
Andrew Crawford
Director / Manager Planning Services




WOLTER CONSULTING GROUP                                                                            PAGE 5

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.