Original source · versioned page text
Revised Civil Engineering Response Cover Letter
ISSUE 19 The earthwork cross sections do not appear to extend into the adjoining properties to the east and indicate the recently constructed access driveway and surface levels Information Required: Indicate on the adjoining driveway on the engineering cross section plans and also include on the plans any measures necessary to protect the structural integrity of the driveway and the adjoining property RESPONSE Please refer to the attached updated civil drawings which show the as constructed levels of the adjacent driveway. It is confirmed from the subdivision works that the driveway is typically 0.8m back from the cadastral boundary and whilst there is a sandstone boulder wall (1 block high) along part of this boundary, the maximum step is 0.4m and not in the locations of where the earthworks cross sections are cut. To address this, Top of wall and bottom of wall RLs (TOW, BOW) are given on drawing 2123 - R04 (Rev C). None of the proposed height changes are more than 600mm and, given the setback to edge of driveway concrete, means the adjacent driveway pavement will not be undermined. Exact construction methodology for footings in this area is to be managed as part of the structural engineering works. It is proposed that a condition is included with any decision notice to confirm that development works would not undermine or impose loads unaccounted for to the adjacent lot driveway pavements. ISSUE 20 Information Required: Provide updated OPW drawings for the bioretention basin which address the following issues: 20.1 Provide survey for the existing drainage system that the bioretention device will connect into (i.e. existing pit IL and pipe diameter and outfall IL). Confirm that the basin subsoil drains will drain effectively. 20.2. Show the proposed subsoil drain layout in plan view. 20.3. Inconsistent level information is shown in the boxed text and on the sections for the bioretention on drawing R07 – resolve inconsistencies RESPONSE Item 20.1. The invert of the proposed stormwater pit was confirmed on site (measured by engineer) to be 1.65m deep. This provides sufficient depth for the proposed detention tank connection. Item 20.2. Please refer to the attached drawing 2123/R07 for updated subsoil layouts Item 20.3. Please refer to the attached drawing 2123/R07 for updated RLs. ISSUES 21 & 22 Information Required: 21. It appears that a detention basin was provided within the downstream drainage reserve as part of the original development of the industrial estate. Consider whether the detention tank proposed is necessary given this downstream infrastructure. 22. If the detention tank is retained, address the following: 2123 – 3 Taylor Court, Cooroy 3 CL/cl
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.