Skip to the record
Noosa’s premier civic archive.

Council archive · source document

09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654

of 52

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

IDAS Assessment Checklist, Version 22

 

    

 

 

INTEGRATED PLANNING ACT 1997
~ ALA = a a SM aS ges :
ISECTION 1 sec ed for all applications that require completion of the IDAS Assessment Checklist, “2
iii ses si — = - . em
}HERITAGE " ZL
er the Queensland Heritage Act 1992?

 

1.1A Is any part of the proposal intended to be carried out on a Queensland heritage place und
No-Goto118  ([] Yes ,
IPA, schedule 8. part 1, tabie 5, tem 2; IP Regulation, schadule 2. table 2. dem 18.
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land? .

_ BX) No-Gotogr2 =] Yes
IPA, schedule 8, part t, tab%e 5, item 2A, IP Regulation, schedule t, part 2. table §. Kem 2.

|REMOVING QUARRY MATERIAL; WILD RIVER AREA
Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?

BX] No-Gotoq7.3 [[] Yes
JPA, schedule 8, part 1, labie 5, dem 1; P Regulation, schedule 2, table 2, item 11, IP Regulation, schedule |, fable 5, tem 2 (wild iver area); Water Act 2000, -

1.2

section 966C, Wild Rwers Act 2005, section 43A .

|ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
OX] No-Gotoar4 [7] Yes

IPA, schedule 6, jiari 1. table 2."itent 1; IPA, sthecide 3. part 1, latle 5, dems 3 and 4: iP Requiatien, schedule 2, table 2, ems 1 ane 23; Environmenta: Protection Act 1994. sectian
vets Act 2005, section ¢3A. relevant wild river decisration: Wild Rivers Cade.

GAA tale tivar area}, W

  
 

‘WITHIN THE LIMITS OF A PORT

1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

No - Go to 01.5
LD Yes

JP Regulation. schedule 2, table 2, items 15 and 16

 

|DECLARED FISH HABITAT AREA

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

LX} No - Goto 1.6
O Yes - if answers fo questions in other sections of this checklist indicate that the proposed development is assessable under IPA, sched,
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the

Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
EP Regulation, schedule 2. tabie 2. tem 28

[COMMUNITY INFRASTRUCTURE

1.6 ls any part of the premises designated for community infrastructure?

DX] No - Goto 91.7
(Yes
1 Regulation. schedule 2. fable 3, dem 7
WASTE WATER MANAGEMENT j
Does the proposal involve the establishment or expansion of a waste water disposal system?

1X] No -Endof Section 1 (T] Yes
IP Regulation. schedule 2. fable 3, dem 5

17

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.