09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 SECTION Ni2 Section 2 must be completed when the application seeks approvat to make a material change of use of. premises" 'STATE PLANNING REGULATORY PROVISIONS AND PLANNING SCHEME ~~ 2.4 Is the proposed use assessable under any State planning regulatory provisions? [XJ No LI Yes If no, is the proposed use assessable under the planning scheme? (J No - Go to 92.2 [J Yes - Comptete Form 1. Part D and answer Q2.1.1 - 2.1.13 below iBROTHEL 2.2 Is the proposed use a brothel as defined under the Prostitution Act 1999? BXJ.No -Gotoa23 (] Yes IPA, schedule 8. part 1, table 2, item 2: Prostitution Act 1999, section 64 |STRATEGIC PORT LAND. 2.3 Is any part of the use proposed on Strategic Port Land under the Transport Infrastructure Act 1994? EX] No -Got0a234 [] Yes : IPA, schedule 8, part 1, table 2, item 3; IP Regulation, schedule 2, table 2-item 6 |AIRPORT LAND 2.3A \s any part of the use proposed on Cairn and Mackay airport land under the Airport Assets (Restructuring and Disposal) Act 2008? EX} No-Gotoa24 ([] Yes IPA, schedule 8, part 1, table 2:itemn 3A; IP Regulation. schedule 2, table 2, item 6A » [MAJOR HAZARD FACILITY” us" 32. rete : 2.4. Is the proposed use a major hazard facility or possible major hazard facility under the Dangerous Goods Safety Menogomert Act 2001? &X No - Go to 02.5 oO Yes - (Complete Form 1, Part L) This application requires assessment by the Department of Emergency Services (DES). if DES is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA, schedule 8, part 1, table 2, item 4; iP Reguiation, schedule 2. table 2, tem 7 [CONTAMINATED LAND REGISTEREDLAND’ 2 =. we 25 's any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the Environmental Protection Act 1994? EX] No -Gotoaz6 ([] Yes IPA, schedule 8, part 1, table 2. item 5; 1P Regulation, schedule 2. iabie 2 tem 22 ‘CONTAMINATED LAND - NOTIFIABLE ACTIVITY Boog SY : " 26 Is any part of the land forming the Premises currently used for a notifiable activity, or if there is no existing use was it last used for a notifiable activity? X] No -Gotoo27 [_] Yes re schedle 8, part 1, table 2. item 6: IP Requiation, schedule 2. table 2. item 22 'CONTAMINATED LAND - INDUSTRIAL ACTIVITY: 27 !s any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there is no existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)? [X] No -Gotoaz8 (_] Yes IPA, schouule 8. part 1, table 2 item 6: IF Reyulition. schedule 2 table 2, tem 22 |CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY) ® 28 Is any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial activity (other than for a mining activity or petroleum activity)? IX] No - Go to029 CO Yes JPA, schedule 8, part 1, table 2 item: JP Requialion, schedule 2. table 2. item 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.