Council archive · source document
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
-o -
49 Is the Proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
& No ( Yes
Act 2008 .
(i) To increase the storage capacity of a referable dam by more than 10% & No 1) Yes
If yes to either or both (i) or (ii) above - (Comptete Form 1, Part Ky This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4. item 4: IP Regulation, schedule 2, table 2. item 10
(TIDAL WORK; WILD RIVER AREA’, “i
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
1X] No -Gotoost1 [7] Yes - Answer {a) and (b) below .
IPA, schedule 8, part 1, fable 4, item §; IP Reguiation, schedule 2, table 2, items 12, 14 and 17:1P Regulation. schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 1044 (wild river area)
{COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA pe, Le a
411 Is any of the operational work proposed to be carried out within a coastal management district?
[X] No -Gotoasi2 [J Yes
IPA, schedule 8. part 1, table 4, item 5: IP Regulation. schedule 2. lable 2, items 12 and 14: IP Regulation, schedule 1, part 3, lable 4, flens 4A and 5
Coastal Protection and Managoment Act 1995 Act 1995. section 1044 (wild river area); Wild Rivers Act 2008, section 43A
(WATERWAY BARRIER WORKS; WILD RIVER AREA fen
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[X] No -Gotoa413 [7] Yes
IPA, schedule 8, pat 1, table 4, em 6, IPA, schedule 6, part 2, table 4. dea 2 Fisheries Sagulation 1995 31124 {sell-ascassante codesh: IP Regulation, schedule 2, table 2. tans 2a
Requtation, sehedute 1, part 3. tela 4, tant 6: Fisheries Act 1994, section 760 wit aver area), Wild Rivers, Act 2008, secticn da
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994? : : ,
EX] No - Goto 04.14
Yes
REMOVAL; DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER ARES” di Ces
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No -Gotoa415 [7] Yes
1
4.15 Is any of the operational work Proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No. -Gotea416 [[] Yes
IPA, schedule 8. part 1. table 4, item 10: 1P Regulation, schedule 2. table 2. item 37, Wild Rivers Act 2005, sections 42. 434
manpenensy
ISTATE-CONTROLLED ROAD
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Envotsecions [] Yes
IP Requiation, schedule 2. table 2. item 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.