Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654

of 52

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial
fdevelopment for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
code to that type of development.

 

 

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA

4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

BX] No -Gotoas3 [_] Yes

JPA, schedule 8. part 1. table 4, item 2; iP Regulation. schedule 1, part 2, tabie 5, ilern t(c)

Wild Rivers code (Note: the code doas not cinrently contain applicable provisions for residential, industral or commercial development inside a designated whan
area)

 

 

 

|KOALA CONSERVATION (inside SEQ urban footprint)

4.3A Is any part of the premises in an interim koala habitat protection area?

[XJ No -Gotoa438 (_] Yes
IP Regulation, schedule 2. table 2, item 344

 

. \VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA a [email protected] ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999

applies?

[XJ No -Gotoas4 [[] Yes

IPA, schedule 8, part 1. table 4. items 14-16. iP Regulation, schedule 2, table 2. item 5 (vegetation cleaving); iP Regulation. sched:
conservation): IP Regulation, schedule 1, part 3. table 4, item (vegetation clearing-wild river area}; Vegetation Management Act 1999.
Clearing/wild river area): Wikd Rivers Act 2005, sections 31F and 43A

 

   
 

fable 2, deni 34 (koala
clion 22A (vegetation

 

iTAKING OR INTERFERING WITH WATER; WILD RIVER AREA

 

44 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring {other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

[DX] No -Gotoa45 [7] Yes - Answer (a) and (b) below

IPA, schedule 8, part t.lalve 4 items {a}. iP Regulation. schedule 2 table 2. item $; [P Regulation, schedule 1. part 3, table 4, items 3 anki JA: Water Act
efeaj: Wild Felvers Act 2005, section $3A. retevant wild river declaration: Wid Rivers Code

 

ios Q6GA {wild rivie

45 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto 04.6 Oo Yes - (Complete Form 1, Part K,) This application requires assessment by the Department af Natural Resources and Water
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, tem 3{h): IP Regulation, schedule 2. table 2. item 8: IP Regulation, schedule |. part 3. table 4, tem 3
Wild Revers code (Nole. the code does not curently contaitt applicable provisions far taxing or interfering with artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[XI No -Gotoa4.7 [_] Yes - Answer (a) and (b) below

IPA, schedute 8. part 1 table 4. imam sicign: Regulation cchedule 2. table 2, tem 8. [P Regulation, schedule 1 part 2 table + tem
Wao Rivers Act 2005, section 4 2A: retevant aiid diver declaration: Wad Rivers Coa.

 

47 - Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
BQ] No -Gotoass (_] Yes
IPA. schedule 8. part 1, lable 4, item 3ic}{i): 1P Regulation, schedule 2. table 2. item 5: IP Regulation. schadule 1, part 3. able 4. tem 3
Water Act 2600, saction 960A {wild :ver area}iNole no curen! Wid River declaration idaniifies taking 0 interfering wilh subariesian water as assessable}
Wild River code (Note. the code daes not currently contain applicable provisions for sub artesian water}
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
IX] No -Gotoas9 (—] Yes - Answer both (a} and {b) below

IPA, schedule & part t table ¢, tems iciii) and Sid), 1P Regudation, scheaule 2, fable 2, item 9: IP Reguisies. schedule 1. part 3, fable 4, tem JA Water Act 20
fiver area): relevant wid river dectaration, Wid Rivers Code.

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.