Council archive · source document
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654
(Cut cnste Sim Pym ne RAURAR aEe platinum SITE NOTES + ALL STORMWATER ANO DRAINAGE TO BE IN COMPLIANCE WITH BCA PARTS 3..263.5.2 * CONNECT DOWNPIPES TO ONSITE WATER STORAGE iF APPLICABLE, THEN OVERFLOW TO AS WELL AS AS/NZS 3500. LEGAL POINT OF DISCHARGE VIA SOmm DIAMETER UPYC STORMWATER PIPE LAID WITH A. Tati, PaQreRTy GuoUP + ENSURE 90mm DIAMETER AGRICULTURAL DRAINS ARE PROVIDED TO THE BASE OF ALL MINIMUM FALL OF 1:80, DISCHARGE TO THE SATISFACTION OF THE RELEVANT GL _bxisting CUTS ANG RETAINING WALLS AND ARE CONNECTED TO THE STGRMWATER SYSTEM VIA. AUTHORITY. . . a (O09 Lic Ma 1173972, SILT PIT/S TO THE RELEVANT BUILDING REQUIREMENTS. © 2 DOWNPIPES MAX. TO EACH 90mm STORMWATER PIPE, SUBSURFACE PIPES TO BE . 1 ti morsga na + THE EXTERNAL FINISHED SURFACE SURROUNDING THE BUILDING MUST BE ORAINED + 100m DIAMETER, ANY UNDERSLAB PIPING TO HAVE AN INSPECTION OPENING ATurrer | CLT aa EXISUN Enozanasss AND GRADED TO MOVE SURFACE WATER AWAY FROM THE BUILDING. PROVIDE 4. SLOPE END, IT IS TO BE 100mm SEWER GRADE PIPING WITH NO JOINS UNDER SLAB. GUITERS ” sooaclaukuunccasareadach at NOT LESS THAN SOmm OVER THE FIRST 100Omm FROM THE BURDING, | TO GE 125mm D SECTION COLORBOND ’ FILL existing RLCOPYRIGHT RP RP RYED IN PART + THE HEIGHT OF THE OVERFLOW RELIEF GULLY RELATIVE TO DRAINAGE FITTINGS AND + ALL POOL FENCING SHALL BE MIN. 1200mm KIGH AND INACCCROANCE WITH AS 1926.1 — ‘CR PMOLE INES? Of rsd ser GROUND LEVEL MUST BE A MINIMUM OF 160mm BELOW THE LOWEST SANITARY FIXTURE > ON SITE SEDIMENT CONTROL AS REQUIRED noe ‘UMLEROIFETY OF PLATA + DISCHARGE WASTE TO HSTP OR LEGAL POINT OF CONNECTION + METERBOX LOCATION TBC ON SITE . Fl existing mrorestrceaur, . + ALL RETAINING FO BE BY OWNER DESAGN TY L1D FOR THE STRUCTURAL INTEGRITY AND FERFORMAHCE OF THE SMLDING § 3 Sg) til building designers 6 association of . queensland Inc. IMAGE + DESIGN BUILDING DESIGNS 142°60'00" ee TURENG wl exiating residence TOP FLOUR LM arpKax 102] 17.602m . . PROWECT . PROPOSED RENOVATION 12 IER ST PEREGIAN BEACH MANDATORY RAINWATER TANK 3000 PER DUPLEX UNIT, SOOOL PER SINGLE DETACHED DWELLING, FOR . . WCS, WASHING MACHINE COLO WATER TAPS & EXTERNAL TAPS. LOCATION TBC ON SITE 10 PROVIDE THE LESSER OF 100m? OR HALF-ROOF CATCHMENT AREA, WITH 15 LITRE FIRST FLUSH OIVERSION AS PER BUILDER. AUTO SWITCHING DEVICE OR TRICKLE TOP-UP SYSTEM REQUIRED ATTACHED TO TOWN WATER, WITH] BACKFLOW PREVENTION DEVICE. ALL TANKS 10 BE MIN 450mm FROM SIDE OR REAR BOUNDARY. TANKS: OVER 2.4M HIGH T0 BE MIN 15M FROM SIDE OR REAR BOUNDARY, RELAXATION REQUIRED FOR TANKS IN GM FRONT SETBACK. OVERFLOW TO BE CONNECTEO TO LEGAL POINT OF DISCHARGE. . 4 i, i -_ 2 ‘MOTE: SUBATITITION OF AMY STEUCTURAL MEMBERS, SES, GRADES OF ANY VARIATION 1 ANY PART OF THE DESAGH WAL REHDEK HULL AND WOID AMY RE!
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.