SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 NOVEMBER 2017
Page 128 of 135
THE NOOSA ECONOMY
No. Project Responsibility AUF eTe FC Bechet
1 Commence renewal of Park Road boardwalk Infrastructure Planning, Design & Delivery Expression of Interest closed. Four tenderers shortlisted for the tender On track Qo
Manager process which will close at the end of November 2017.
2 Finalise construction of Rufous Street Digital Hub project (Stage Economic Development Manager Construction of the Digital Hub building on track for completion before On track Qe
1) and adoption of hub operating model Christmas.
3 Continued implementation of Local Economic Plan _ incl. Economic Development Manager Continued to deliver on Local Economic Plan Priority actions, highlights On track e@
providing support to existing industry representative groups and include:
evaluation of peak body models - Graduation of Innovation master class participants (12 Businesses)
- Facilitation of 3 workshops with Noosa Junction Association regarding
the future of this centre.
LONG TERM PLANNING FOR NOOSA SHIRE
No. Project Responsibility UT sTe Fic Status
1 Finalise drafting of new Noosa Planning Scheme and obtain Planning Scheme Project Manager Drafting of the new Noosa Planning Scheme is underway, a number of On track QO
Queensland Government approval workshops have been held with Council to inform the development of the
plan.
2 Develop Climate Change Adaptation Plan & actions (Stage 1) Project Coordinator - Climate Change Coastal hazards adaptation plan project on schedule. Risk mitigation On track Qo
Adaptation options analysis being paused to allow appropriate time for stakeholder
engagement. This will have no effect on the final delivery date of the plan
in late 2018.
3 Finalise Noosa River foreshore management plan and Property Manager Draft Masterplan to be discussed at upcoming Councillor workshop. Behind Schedule @
commence implementation
4 Complete detailed asset management plans for identified pilot Asset Planning Manager Pilot asset management plans well underway. Consultants are engaged Behind Schedule @
areas and commence development of asset management plans with the forecast completion of roads & bridges, NAC & Main Beach
for the remaining infrastructure classes Slurry Systems Asset Management Plans by November. On completion,
further classes will be commenced.
5 Commence implementation of priority actions from Council’s Director Infrastructure Services The recruitment process for Project Manager is underway. Work has Behind Schedule ())
Transport Strategy commenced on schools program. Councillor workshop to be held in early
November.
6 Commence detailed design of North Shore Beachfront Property Manager The detailed design has commenced with a number of consultants Ontrack @
campground redevelopment including environmental restoration engaged to develop the construction scope of works. All designs are
works scheduled for completion by April 2018. Site weeding and revegetation
works have also commenced and are ongoing.
7 Review of Noosa Community Support operating model in Community Facilities Manager Paper on the future of Noosa Community Support being developed by the Ontrack @
preparation for new funding arrangements Community Facilities Manager
8 Development of a robust 10-year Capital Works Program Asset Planning Manager 5-year capital program is in place. Working through the development of Behind Schedule @
the renewal programs based on condition assessment reports being
undertaken. These will form the basis of the 10-year program. Following
the resignation of a staff member recruitment of a suitable replacement
has commenced.
Page 128 of 135See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.