Council archive · source document
001593E2.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Works in tidal areas, coastal 5. Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
management districts and fish habitat Development in a wild river area)
areas
If you answered YES to 05, and ticked any [Jno Ll Yes ,
boxes in 06), your apptication is required to be
assessed 2 against and must comply with the Wid 16. The application is for one or more of the following:
e. . = . . . . *
It you answered YES to OS and ticked box i in C i) Operational works that is tidal works or works in a coastal management district (ensure you
Q6, your application is required to be referred to have completed Part M and/or Part P of Form 1); Or ‘
the EPA. - . . .
Noe: I spectied works re proposed in alocal (_] ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
government area, it is prescribed tidal work - the completed Part O2 of Form 4), OF
sesasomtent nonager with tha EPA es 8 [1 iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
relevant local government will be the Pn tdi : : 5
concurrence agency .
\f you answered YES to 05, and ticked box ii) or
ff} in Q6, your application requires referral to
DPIF.
If you answered NO to QS and ticked box i) in
Q6, the application wilt not be accepted. ‘
if you answered NO ta Q5, ticked box ii} in Q6
and the development is necessary to install .
authorised works or infrastructure where a
development permil Is not required, or if a
required permit is held, the applicatlon must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above wilt
not be accepted.
If you answered NO at Q5 and ticked box iii) in : .
Q6, the application may be made if the works are
ina PA. These applications must de assessed . .
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
Residential, commercial or industrial 17. Is the application for residential, commercial or industrial development in a designated urban
development area?
if you answered YES to Q7, your application is
nat subject to wild fiver requirements. Provided L] NO L YES
there are no other aspects of this development
acta ee Md Rass Cove, you do ot 8. If NO, does the application for residential, commercial or industrial development involve:
vi aralian Of ¥¥ii IVErs .
need to comptete the remaining questions in L_] i) a material change of use made assessable in a local government planning scheme
Section 2 ou (ensure you have completed Part D of Form 1); or
If you answered NO lo Q7 and licked either box . . . : .
i) or ii) in Q8, the assessing agency is the CO ii) operational works associated with reconfiguring a fot (ensure you have completed Part F
relevant local government. The application must of Form 1}.
be assessed against and must comply with the
Wild Rivers Code.
S Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
If you answered YES to Q9 your application under the Wild Rivers Act 2005} in a PA?
requires assessment against and must comply
with the Wild Rivers Code. [CJ No Cc YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW,
Note: Applications for animal husbandry
activities will nol ba accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
If you answered YES to Q10, your application a PA?
requires assessment against and must compl
win the Wild Rivers Code. My | NO LC] YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW.
Note: Applications for agricultural activities wil | 11. If YES is the application for.
not be accepted if proposed in a HPA. For more , : .
details and a definition of agricultural activities [_Ji) a material change of use; or
se the Wild Rivers Act 2005 and refer to Guide [] ii) operational works.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as .
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
Page 11See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001593E2.001.pdfRelated documentPublic source context ↗
07/0481 - Retail Business Type 2 - Shop [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.