INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Works that take overland flow water |12. Does the application involve works that take overland flow water in a HPA or an FMA?
The relevant wild river declaration will state
works that take overland flow water are either [-] No [] YES (ensure you have completed Part Ks of Form 1)
self assessable or assessable, or are exempt
from wild river requirements. 13. If YES, is the application for works stated in the relevant wild river declaration to be?
tf you ticked Q13 i), your application must be .
assessed by NRW against the Wiki Rivers Code LJ i) assessable works .
ancl must comply with the code. [1] ii) sel-assessable works
If you ticked Q13 ii) an application is not required ss
to be made however the works must comply with iti) exempt works
the retevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an apptication
is required and must be assessed by NRW .
against the relevant pant of the Wild Rivers Code
and must comply with the code.
tf you ticked 013 ii} your application is not
subject to wild river requirements.
Applications for development that is other than
thal stated to be assessable, self-assessable or
exempt wil! not be accepted.
Works that interfere with overland 14. Does the application involve works that interfere with overland flow water in a FMA?
flow water
The relevant wild river declaration will state 0 NO U S (ensu eyoun plete vant Part K of Form 1)
YE TC ave completed the relevant Part K of Form 1
works that interfere with overland flow water that . .
are either self assessable, assessable or exempt! 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
from wild tiver requiremenis. a i) assessable works
If you ticked Q15 j}, your application must be
assessed by NRW against the Wild Rivers Code C ii) self-assessable works
and must comply with the code. . .
{f you ticked 15 ii) an application is not required C) ill} exempt works
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works bacome
"assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q15 iii) your application is not
Subject to wild river requirements.
Applications for development that is other than -
that stated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
Applications for building or raising walerway
bartier works in a HPA will not be accepted. L] NO [_] YES (ensure you have completed Part Os of Form 1)
If you answered YES to Q16, your application
must be assessed by DPIF against ihe Wild
. Rivers Code and must comply with the code.
Aquaculture (non ERA) 17. Does the application involve aquaculture in a PA? ©
eee for aquaculture in @ HPA will not be CL] NO LJ YES (ensure you have completed Part O, of Form 1)
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with water ina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nominated waterway in a PA?
Note: If the development is proposed in a HPA,
applications for all works that interfere with water CL] NO ["] Yes (ensure you have completed the relevant Part K of Form 1)
in a watercourse (including dams or weirs,
siream realignment or stream diversion} wili not 19. IFYES
be accepted. ‘
In a PA, applications for instream dams and (J i) The application is for an instream dam or weir; or
I you licked box ij ir O19, yout apolestonat’ | C1 4) The application is for operational works that interfere with water in a watercourse, and is
not be accepted, for development other than a dam or weir.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated . .
waterways is available by contacl NRW,
accessing the department's website
www.nrw.qid.qov.au or contacting the
department by email on:
wild [email protected] 12See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001593E2.001.pdfRelated documentPublic source context ↗
07/0481 - Retail Business Type 2 - Shop [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.