Original source · versioned page text
2016-02-02 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 2 FEBRUARY 2016
There are a number of projects that have been completed in the second quarter of the financial
year and some of these include:
Pomona Rifle Street Flood Mitigation
Whole of Shire Replacement of Off-Support and Off-Lease Libraries PC’s
Peregian Beach Skate Park Shade Sail Renewal
Whole of Shire Gravel Re-sheeting Annual Programme
Noosa Heads Main Beach Sand Pumping Pipe Replacement Programme
Whole of Shire Park Shelter Renewal
Whole of Shire Playground Refurbishment
Whole of Shire Park Furniture Renewal
Tewantin Splash Park, Playground renewal
Sunrise Beach Ben Lexcen stormwater pipe re-lining
Noosaville Tait - Duke Cottage relocation
Cooroy Belli Creek Road Timber Bridge deck resurfacing
Noosaville Noosa Waters Navigational Lock Renewals
Sunshine Beach NAC – 50m pool hydraulics report
Castaways Beach Beach Access 42 Renewals
Castaways Beach – Beach Access 42 Tewantin – RSL Park Playground
Works Completed
2. Projects Underway
There are a number of projects that have also recently commenced or are well underway:
Noosaville Munna Point Bridge rehabilitation
Whole of Shire Road Pavement Reseal & Rehab Programme
Whole of Shire Bus Stop renewal Programme
Cootharaba Dr Pages Rd & Kinmond Creek Rd Upgrade
Sunrise Beach Ben Lexcen Drive School Crossing Improvements
Page 16 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.