Asat 31-Dec-2015 ATTACHMENT 1
500003 500003 - Noosaville - Munna Point Bridge Stage 2 1,627,005 3,136,779 3,136,779 951,948 1,599,970 30.35% Mr Adam Britton
500500 500500 - Cooroy Mary River Road Timber Bridge Rehabilitation 50,000 50,000 50,000 10,613 0° 21.23% @ ce) Mr Cameron Shields
500501 500501 - Cooroy, Cooroy- Belli Creek Road Timber Bridge deck resurfac 10,000 10,000 10,000 1,094 08 0.94% @ @ @ Mr Cameron Shields
500502 500502 - Whole of Shire Annual Level 3 Bridge inspection program 2016 30,000 30,000 30,000 3,173 08 10.58% Mr Cameron Shields
500503 500503 - Whole of Shire Bridge replacement program - Planning and des 200,000 200,000 200,000 08 00% @ O @ Mr Craig Eldridge
Total Bridges 1,917,005 3,426,779 3,426,779 1,599,970 28.21%
500004 - Noosaville - Gympie Tce / Williams St 222,565 222,585 32,447 0° 14.58% @ @ Mr Dallas Bickley
500071 500071 - Noosa Waters - scour protection stage 2b 713 oo 000% @ @ @ Mr Adam Britton
500109 500108 - Munna Point Foreshore Stabilisation 49,026 49,028 40,830 9,680 83.28% Mr David Shing
500504 500504 - Noosa Heads Ravenswood Park Public Jetty Rehabilitation 35,000 59,000 59,000 52,767 5209 6.48% © OO Mr David Shing
500505 500505 - Tewantin Doonella Street Public Jetty Rehabilitation 28,000 53,921 53,921 50,069 08 92 Mr David Shing
86%
500506 500506 - Sunshine Beach - Beach Access 30 45,000 45,000 45,000 27,459 08 61.02% eo°o Mr David Shing
500507 500507 - Sunrise Beach - Beach Access 34 Replace stairs adjacent road 50,000 50,000 50,000 22,952 19610 459% 9 @ @ Mr David Shing
500508 SO00508 - Castaways Beach - Beach Access 42 70,000 70,000 70,000 75,[email protected]% Mr David Shing
s00509 500509 - Noosaville Noosa Waters - navigational lock renewals 13,000 13,000 13,000 8.496 2,[email protected]% 9 OD Mr David Shing
500510 500510 - Noosa Heads Main Beach - Sand pumping pipe replacement progr 50,000 50,000 50,000 36,639 08 7728%5 9 @ @ Mr David Shing
00612 500598 - Munna Pnt Foreshore Rehab Stg 2 Design Drawings and Approval 27,500 27,500 0° 0.00% @ @ @ Mr David Shing
Total Coastal Canals and Waterways 291,000 640,034 640,034 274,779 90,048 42.93%
s00207 500207 - Rufous St Design & Development Phase 300,000 313,167 313,167 59.999 69,211 19.16% Mr Fox Rogers
$00511 500511 - Sunrise Beach Shopping Centre Refurbishment 60,000 60,000 60,000 4.09 6,760 0 7.18% @ @ @ Mr Clint Irwin
Total Commerical Land and & Property 360,000 373,167 373,167 64,308 95,974 17.23%
eee eee eee ee eee eee
500011 500011 - Mil Place Boiler House - stage 2 97,300 97,300 ° 0° o0% OO @ Ms Kerri Contini
00014 §00014 - Noosa Limrary and NLC Plumbing 15,000 15,000 ° 0° 00% OOO Ms Kerri Continé
500016 500016 - Whole of Shire - community light poles 70,440 70,440 ° 4,700 @ 000% @ O @ Mr Clint trwin
§00021 500021 - Noosa Respite Centre - internal refurb 238,666 238,866 227.914 3.6220 95.42% @ @ e Mr Greg Tucker
500072 500072 - Noosa Heads - lifeguard storage survey ° Oo 453 oo 000% @ @ ° Mr Clint Irwin
500073 500073 - Tait Duke House - relocation 58,064 56,084 $3,966 500 2 92.91% @ @ Qo Mr Martin Sergas
00110 500110 - Tewantin Spray Park Shade Sail ° o 2.119 0° 0.00% @ $ ° Mr Dallas Bickley
500208 500208 - NAC 25m pool Retile and Regrout 59,300 59,300 59,200 oe 100.00% 2 Mr Stephen lames
$00512 500512 - Sunshine Beach NAC - Hydraulics Report 50mtr poo! filtration 10,000 10,000 10,000 3,500 o®@ 35.00% @ 2 Ms Emma ONeill
500513 §00513 - Cooroy Library - Roof drainage repair and replacement 11,500 11,500 11,500 10,055 > 1.96% © 2 Ms Kerri Continé
500514 500514 - Sunshine Beach NAC - Regrout & recaulk of the Program Pool 0,000 3,000 30,000 o* 0.00% © = Ms Emma ONeill
500515 500515 - Noosa Heads Surf Club Public Amentities Refurbishment 85,000 85,000 85,000 o® 0.00% © 2 Mr Clint Irwin
500516 500516 - Sunshine Beach NAC - Replacement of Program Pool heat pump 55,000 55,000 55,000 86,400 * 0.00% © <= Ms Emma ONeill
500538 500538 - NLC - Stage 2 Construction of redesigned reception area 45,000 45,000 45,000 1,100 of 2.44% & * Ms Emma ONeill
500539 500539 - Noosa Heads Demolition of Lifeguard Service! SLSQ operations 21,000 21,000 21,000 oo? 0.00% * Ms Emma ONeill
500609 500595 - Noosa Leisure Centre Fire Indicator Brd 6,642 6.642 oo? 0.00% = Ms Cathy Simon
500616 500602 - Sunshine Beach - Solar Bollard Replacement Trial 10,000 10,000 oo? 0.00% ° Mr Bryan OConnor
500617 500603 - Noosa Leisure Centre and The J - Evac Centre Switchboards 25,600 25,800 o®? 0.00% © J Mr Fox Rogers
500620 500606 - Respte Centre / Shed 25,000 25,000 o®? 0.00% <= Mr Greg Tucker
500621 500607 - Replacement of Condensor units at The J 32,051 o® 0.00% © 2 Mr Allan Hazell
Total Community Facilities 257,500 876,709 876,709 380,629 105,277 43.42%
500022 500022 - Tewantin Council Office - roof rehab ° 3,000 30,000 1,209 oo 4.38% ° Mr Clint Irwin,
500517 500517 - Noosaville Depot Fire protection system and panel renewal 17,000 17,000 17,000 St 08 030% 9 @ @ Mr Clint Irwin
Total Corporate Buildings 17,000 47,000 47,000 1,360 0 2.89%
iaiatir* > aialiar'*2> Kr nt oro y ocr es ee ee rs ss YY
500540 500540 - Noosa Heads Weyba Creek Bank Erosion rehab and access 100,000 100,000 100,000 16,665 43,540 © 167% @ OG Ms Jan Maddin
Total Environmental Assets, Bushland, Tracks and Trails 100,000 108,990 108,990 16,665 43,540 15.29%
500027 - Whole of Shire - replace council fleet 454,466 454,466 255,357 08 56.19% Mr Phil Parkrnan
500516 500516 - Plant and fleet replacement program 2015-2016 1,854,000 1,854,000 1,854,000 423,834 444,[email protected]% @ OO Mr Phil Parkman
Total Fleet - Plant Replacement 1,854,000 2,308,466 2,308,466 679,191 444,725 29.42%
500519 500519 - Whole of Shire Gravel Resheeting - Annual Program 2015/16 350,000 350,000 350,000 205,435 37,[email protected]% Mr Allan Hull
Total Gravel Road Network 350,000 350,000 350,000 205,435 37,980 58.70%
Cee e renee ener ener
$00113 500113- Coorey RV Stopover o 32,949 32,949 31465 6o 95.50% @ @ @ IM) Mr Dallas Bickley
Total Holiday Parks o 46,231 46,231 33,550 72.57%
00075 00075 - Whole of Shire - Tech One HR module 105,990 105,990 31,162 41,812 29.40% Mr Justin Thornas
500520 500520 - Replacement of off-support and off-lease computers at Noosa 34,600 34,600 34,600 34,060 08 98.44% ee°90 Mr Justin Thomas
500541 500541 - Whole of Shire Mobile Mapping Stage 2 - Hardware & Configura 80,000 80,006 80,006 33,081 99799 4136%9 086 Mr Bryan OConnor
500542 500542 - implementation of Ci Anywhere Functionality for TechnologyOn 80,000 80,000 80,000 46,[email protected]% @ O @ Mr Justin Thomas
Total Information Technology 194,600 300,596 300,596 98,312 98, 32.71%
500212 500212 ~ Tewantin Sptash Park Playground Renewal 130,000 130,000 113,23 87.09% Mr Dallas Bickley
00521 500521 - Peregian Beach Skate park Shade Sai renewal 80,000 80,000 60,000 70,344 oe 87.93% @ es Mr Dallas Bickley
500522 500522 - Sunshine Beach Skate park renewal - Design 36,000 %,000 36,000 5a 08 016% @ @ @ Mr Dallas Bickley
500523 500523 - Whole of Shire Park shelter - Renewal Park shelters 2015/16 45,000 45,000 45,000 40,481 oF 89.91% @ @ @ Mr Dallas Bickley
500524 500524 - Whole of Shire Playground refurbishments 2015/2016 100,000 100,000 100,000 87,848 08 87.85% Mr Dallas Bickley
500525 00525 - Whole of Shire Park Furniture Renewal 2015/2016 50,000 50,000 50,000 37,683 9,150 0 75.37% ee) Mr Dallas Bickley
500551 500551 - Noosa Hinterland Priority Playground - Planning & Design 50,000 50,000 50,000 ° 08 0.00% Mr Oallas Bickley
500618 500604 - Noosaville Foreshore Park Furniture Replacement 112.400 112.400 ° 08 000% @ O @ Ms Sara Cooke
Total Parks & Playgrounds 361,000 603,400 349,607 9,150 57.94%
100737 100737 - Gibson Road (Eumindi Noosa Rd to Thomas St) - On raad cycle 15,000 15,000 13,786 0° 91.91% Mr David Shing
500043 500043 - Noosa Heads - Park Road boardwaik design 156,865 156,865 4,987 0° 311% 9 @@ Mr Adam Britton
500099 - Eenie Creek Pathway Stage 1 Signage 19,003 19,003 2.893 08 15.22% Mr Scott Morgan
500100 500100 - Wallace Park Shared Path Construction 3,619 0° 00% @ O @ Mr Craig Eldridge
500103 500103 - Coorey Noosa Road Corridor Improvement 68,555 68,555 32,364 9,732 0 36.55% Mr Craig Eldridge
500526 500526 - Noosa Heads Park Road, Boardwalk Design and consultation 200,000 199,996 199,996 58.442 178,[email protected]% 09 @@ Mr Adam Britton
500527 500527 - Noosa Heads Sheraton Boardwalk rehabilitation 63,000 63,000 63,000 35,276 oe) 559% @ O @ Mr Brian Freeman
500614 500600 - Tewantin - Beckmans Road - Eumundi Noosa Road 60,000 60,000 08 0.00% @ @ @ Mr Scott Morgan
Total Pathways & Enabling Facilities 602,419 602,419 151,347 188,200 25.12%
500080 SO00B0 - Standards Review - Standard Drawings 13,791 13,791 3,187 23.11% Mr Craig Eldridge
00081 $00081 - Whole of Shire Traffic Study 44,201 41,201 13,200 @ 00% @ O @ Mr Nicholas Wellwood
$00106 500106 - Noosa River Flood Mitigation Strategy 39,164 39,184 5,684 26,384 @ 451% @ @ © Ms Rebecca Britton
500107 500107 - Noosa River Hydraulic Model 290,052 290,052 7.184 90,[email protected]% Ms Rebecca Britton
$00203 500203 - Business Distribution and Land Needs Project 6.425 5,000 @ 00% O@ OO Ms Rowena Skinner
500543 500543 - Whole of Shire Planning Scheme Development Projects 2016 400,000 400,000 400,000 115,339 69,658 © 28.43% @ o Ms Rebecca Britton
Total Planning Scheme 400,000 784,228 137,819 205,117 17.57%
$00001 $00001 - Electric Bus Feasibility Study 4,366 4,366 1,695 o17 38.83% Mr Adam Britton
500050 - Noosa Junction Transit Centre - improve 40,000 40,000 0° cox OOO Mr Dallas Bickley
500083 - Noosa Bus Station Safer Streets Program 90,201 50,291 24,096 74,606 @ 479% O60 @ @ Ms Joanna Ferris
500209 - Electric Bus Charging Station and Installation 77,910 77,910 77,543 19,[email protected]% Mr Dallas Bickley
00211 500211 - Hastings St landscape timber structure renewal 40,547 08 0.00% @ @ @ Mr Brian Freeman
Page 19 of 41See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.