500528 500526 - Whole of Shire Bus Shelter Disabled Compliant Program: 2016 1,500,000 1,500,000 1,500,000 126,766 oo 8.45% GO O e Mr Dallas Bickley
500554 500554 - Translink Bus Stops Walter Hay Drive 49,038 oo 000% @ @ ° Mr Scott Morgan
$00613 5005899 - Noosaville Walter Hay Drive - Bus Shelters 27,710 27,710 08 0.00% @ @ ° Mr Scott Morgan
Total Public Transport Infrastructure 1,500,000 1,700,277 1,700,277 319,684 95,113 18.80%
100742 100742 - Sealed Road Pavement surveys and Investigations 39,064 39,064 15,000 @ 253% @ @ @ Mr Bryan OConnor
500054 - Whole of Shire - pavement surveys 19,687 19,687 12,796 56700 65.00% @ @ e Mr Bryan OConnor
500055 - Whole of Shire - reseal and rehab 1,378,680 1,376,680 336,317 08 24.39% © @ ° Mr Allan Hull
500062 - Noosaville - Eumundi Noosa Road corrkior 7776 oo 0.00% @ @ ° Mr Ross Sanderson
$00118 500118 - Dr Pages - Kinmond Creek Rd Initial Planning & Design 75,055 75,055 94,022 oo 125.27% @ @ ° Mr Craig Eldridge
500206 - Tewantin Cooroy Noosa Rd Stages 2-6 Design Only 120,986 120,986 9.209 oo 761% @ @ ° Mr Craig Eldridge
500530 - Whole of Shire Reseal & Rehabilitation Program 2015/2016 4,750,000 4,750,000 4,750,000 1,327,603 2,081,[email protected]% @ @ ° Mr Cameron Shields
$00531 500531 - Whole of Shire Pavement surveys and Investigations 2015/2016 60,000 60,000 60,000 11,520 7,[email protected]% @ @ e Mr Bryan OConnor
500544 - Cootharaba - Or Pages Road & Kinmond Creek Rd - Construction 4,700,000 5,500,000 5,500,000 396,872 4,580,192 @ 722% @ @ e Mr Adam Britton
500619 500605 - Cooroy-Belli Ck Road Slip Repair 400,000 400,000 ° oo 0.00% @ @ ° Mr Allan Hull
Total Sealed Roads Network 9,510,000 12,343,472 12,343,472 2,197,104 6,690,713 17.80%
500108 500108 - Girraween Sports Complex Lighting 10,000 10,000 6,705 oo 67.05% 9 O @ Ms Alison Hamblin
500545 - Tewantin Noosa District Sports Complex - Internal roadway pl 30,000 0,000 30,000 1,980 0° sen 0 0 OW Mr Craig Eldridge
Total Sports Ground and Facilities 40,000 40,000 8,686 21.71%
100745 100745 - Gympie Terrace Pipe Rehabilitation - Investigation & Design 10,763 10,763 9,010 0° 83.72% @ @ ° Mr Bryan OConnor
500057 - Gympie Terrace pipe rehabilitation 194,386 194,386 18,612 oo 957% @ @ ° Mr Bryan OConnor
500058 - Re-lining of Ben Lexcen stormwater 153,257 153,257 139,211 08 90.84% OG O e Mr Bryan OConnor
500060 - Whole of Shire - stormwater structures 47,580 47,580 12,545 08 26.37% @ @ ° Mr Allan Hull
500084 - Whole of Shire - Flood mitigation stage 2,352,457 2,352,457 2,155,784 59,[email protected]% @ @ 2 Mr Adam Britton
$00532 500532 - Whole of Shire CCTV Drainage program 2015/2016 50,000 50,000 50,000 512 oo 102% @ @ e Mr Bryan OConnor
500533 - Whole of Shire Pipe re-lining/ rehabilitation program 2016 250,000 249,998 249,998 2.583 oo 103% @ @ ° Mr Bryan OConnor
500534 500534 - Whole of Shire Stormwater Pit Structure renewal program 2016 200,000 199,998 199,998 129,[email protected]% @ @ ° Mr Brian Freeman
500535 - Whole of Shire Kerb & Channel Renewal Program 2015/2016 50,000 50,000 50,000 0° 0.00% @ @ ° Mr Brian Freeman
Total Stormwater Drainage 3,308,439 2,338,258 188,315 70.68%
500085 500085 - Peregian Beach - precinct planning 29,618 29,618 08 158% 9 @ @ Mr Nicholas Wellwood
Total Streetscapes and Road Corridors 29,618 29,618 1.58%
100751 100751 - Eenie Creek Road / Walter Hay Drive Intersection safety upgr 37,632 oo 0.00% @ @ ° Nigel Walker
100752 100752 - Weyba Road Reef Street Intersection Improvements - PP 104,480 104,480 18,676 16,1800 17387%% @ @ Mr David Shing
500064 - Sunrise Beach - Ben Lexcen Dr school 45,716 45,716 4,326 oo 246% @ @ Mr Craig Eldridge
500536 500536 - Tewantin Cooroy Noosa Rd Traffic Management Construction -A 160,000 160,000 160,000 2,374 15,668 @ 148% @ @ Mr Dallas Bickley
500546 500546 - Whole of Shire Forward Planning & Design Program - Construct 0,000 0,000 300,000 27,272 7310 900% @ @ Mr Craig Eldridge
500547 500547 - Sunrise Beach Ben Lexcen Drive School Crossing Improvemente 430,000 430,000 430,000 30,008 273,528 @ 698% O DO Mr David Shing
500548 500548 - Road directional signage (incl Noosa Entrance sign 50,000 50,000 50,000 5,757 oo 11.51% @ @ Mr Craig Eldridge
00552 500552 - Noosa Transport Strategy 150,000 225,000 225,000 40,875 99,6250 18.17% @ @ Mr Scott Morgan
$00553 §00553 - Whole of Shire Street lighting program 2015/2016 15,000 15,000 15,000 184 oo 123% @ @ om Mr Cameron Shields
500615 500601 - Noosaville Eenie Ck Pathway signage stage 2 120,000 120,000 oo 00% OOO Mr Scott Morgan
Total Transport and Infrastructure Management 1,105,000 1,450,196 1,450, 167,103 405,782 11.52%
500066 500066 - Noosaville Landfill - bio basin oO 7.130 oo 0.00% @ 0 @ Mr Adam Britton
S00067 500067 - Noosaville Landfill - sediment control °o 400 4160 0.00% 9 OO Mr Adam Britton
ANIA 500112 - Noosaville Landfill - Dosing & Monitoring Equipment ° 120,000 120,000 ° oo 0.00% aH mm au an aN/A
$00537 500537 - Noosaville Eumundi Rd Lanefil Concrete Approaches to Weighb 200,000 200,001 200,001 151,413 oo 7.71%9 00 Mr Robert Walsh
00549 500549 - Noosaville Eumundi Rd Lancfil Prepare Cel 2.2 80,000 80,000 80,000 1,516 8,109 @ 190% @ OO Mr Wayne Schafer
$00550 500550 - Noosaville Eumundi Rd Lanefil Relocate Concrete Processing 30,000 30,000 30,000 ° oo 0.00% 9 OO Mr Wayne Schafer
$00611 500587 - Shade Sail Placement at Briteside oO 7112 oo 000% @ O @ Mr tan Florence
Total Waste Management 310,000 430,001 430,001 167,571 8,524 38.97%
Grand Total 19,370,105 29,770,022 29,770,022 8,558,703 10,306,827 28.75%
Capital Works Program
YTD Actual Expenditure $8,558,703
Committed Expenditure $10,306,827
R Capital Expenditure $10,904,492
ema ini
Full Year Budgeted Expenditure $29,770,022
YTD Actual
Expenditure
28.75%
Page 20 of 41See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.