ATTCH 3 - IR Response - Erosion, Coastal Processes and Stormwater (Dr Trevor Johnson)
Attached to the e-mail RAL17/0501 IR Response email 2 of 4.
The original of this document is very large (12.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Kenlynn Pty Ltd Report Number 620.12166-R01 Castaways Beach 3 November 2017 Stormwater Management Plan Version v0.1 Page 8 The design rainfall losses adopted for the analysis were: Pervious Area: Initial Loss = 0 mm Continuing Loss = 2.5 mm/h Impervious Area: Initial Loss = 0 mm Continuing Loss = 0 mm/h A Lag Parameter of 1.30 was used in the WBNM model. Studies carried out using WBNM have found that the average value of the Lag Parameter across a wide range of catchments is between 1.30 and 1.80 (ref. WBNM User Manual). Thus, the adopted value of 1.30 is within the accepted bounds. The WBNM model was run for a range of storm durations, from 10 minutes to 72 hours, with the 15 minute event producing the peak discharge of 0.082 m%/s for the 1% AEP event. This value is consistent with the flow estimate calculated using the Rational Method (as discussed in Section 2.3). Consequently, it was considered that the WBNM model could be used to calculate the discharge hydrographs from a developed allotment. As discussed in Section 2.1, it is proposed to construct a basin or basins with a total area of 100 m? within each developed allotment, to receive the stormwater runoff from that lot. If only one basin is constructed along the eastern boundary, it would be approximately 16.7 metres long (across the lot) and 6 metres wide. For two basins, appropriate basin sizes can be determined based on the catchment areas draining to each basin. The captured stormwater runoff will infiltrate into the existing sand within the basin(s). An infiltration rate of 1,000 mm/h was adopted for clean beach sand. There is no topsoil present on the site, and no plan to import any for the proposed development. The WBNM model, with the inclusion of the detention/infiltration basin, was again run for a range of storm durations, from 10 minutes to 72 hours. The peak depth in the basin for the 1% AEP event was achieved with the 60 minute event, producing a maximum depth of 299 mm. As discussed in Section 2.1, each basin will comprise a detention depth of 300 mm. Consequently, there would be no overtopping of the basin for all flood events up to and including the 1% AEP flood event. 2.5 Summary As discussed above, the proposed stormwater strategy is to grade each allotment to a detention basin or basins located at the downstream boundary(s) of that lot. The basin(s) will capture and infiltrate the stormwater runoff from its respective lot for all floods up to and including the 1% AEP event. Consequently, there is proposed to be no surface discharge from each lot which could affect stability on landslip areas or cause erosion. This addresses Items 10 and 11 of Council's Information Request. SLR Consulting Australia Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.