ANY EXTERNAL TIMBER TO BE ABOVE GROUND
CLASS 1 DURABILITY OR H3 TREATED.
ALL EXTERNAL TIMBER TO BE PAINTED.
ANY EXTERNAL ABOVE GROUND TIMBER MUST BE
SEALED IN ACCORDANCE WITH AS1684 BEFORE IT IS
1
INSTALLED I.E. ALL CUTS, NOTCHES & DRILL HOLES S3.02
MUST BE SEALED BEFORE INSTALLATION TO
MINIMISE THE INGRESS OF MOISTURE.
CUTS TO BE TREATED WITH H3 ENSEAL OR SIMILAR.
IT IS FURTHER RECOMMENDED THAT ONCE SEALED,
MEMBERS SHOULD HAVE A 'MALTHOID' COVER STRIP
(OR SIMILAR) APPLIED TO ALL TOP EDGES OF DECK
JOISTS & DECK BEARERS TO AGAIN MINIMISE THE
INGRESS OF MOISTURE.
xC
WHERE SMARTLVL 13 OR SMARTLAM GL17 ARE
USED IN AN LOSP H3 APPLICATION PLEASE REFER
TILLING DESIGN GUIDES FOR INSTALLATION
CONSIDERATIONS & RECOMMENDATIONS.
ALL TIMBER TO BE
xC
TERMITE RESISTANCE A Check all dimensions before commencement of work.
H3 TREATED S3.02 Check Site boundary dimensions from the Title plans.
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing, the
location, depth and extent of underground or overhead services
EC are to be confirmed and protected on site by the contractor prior
to commencement of works.
xRB
xC
xR1
xR1 1 07.02.2023 FOR CONSTRUCTION MS
RB1
xR1
P1 22.12.2022 PRELIMINARY MS
Issue Date Description By
B Drawing title -
S3.02 EC
ROOF FRAMING PLAN
xC
Project -
PROPOSED DECK
EXTENSION
Client -
xC
Paul Cooper Homes
Site -
24 Attunga Heights,
Noosa Heads
ROOF FRAMING PLAN EXISTING ROOF
EXTERNAL FASTENERS: SCALE A1 - 1:50 TRUSSES OVER
ALL EXTERNAL METAL FASTENERS / BRACKETS INCLUDING SCALE A3 - 1:100 Consulting Civil &
JOIST HANGERS, FRAMING ANCHORS, AND STRAPS WITHIN
2.0Km OF THE COAST LINE TO BE MARINE GRADE (316) Structural Engineers
STAINLESS STEEL. FOR STEP SIZES, FALLS IN SLAB & DOOR THRESHOLD
DETAILS REFER TO ARCHITECT'S DRAWINGS
Project Management
ASSOCIATES PTY LTD
& Planning
PRIOR TO COMMENCEMENT OF WORKS, ALL 124 DUPORTH AVENUE
STRUCTURAL MEMBERS TO BE FULLY PROPPED AND NOTES AND LEGEND
PO BOX 16 MAROOCHYDORE QLD 4558
BRACED BEFORE REMOVAL OF SUPPORTING WALLS FOR GENERAL NOTES REFER DWG S0.01 & S0.02
E-MAIL: [email protected]
AND COLUMNS.
Ph (07) 5443 7777 Fax (07) 5443 7577
RAFTERS:
Approved:
xR1 - EXISTING TIMBER RAFTERS @ 900ctrs
ROOF BEAMS: KEVIN COVEY BEng, CPEng, MIEAust, MSPEPNG, RPEQ1823
RB1 - 310UB 40 STEEL ROOF BEAM CHRIS CAMP BEng(Hons), MIEAust, RPEQ4944
xRB - EXISTING TIMBER ROOF BEAM
Checked : MC Design : SC Drawn : MS
POSTS:
C1 - 89 x 89 x 3.5 SHS COLUMN (Galv.) Scales : AS SHOWN
xC - EXISTING HDWD COLUMN
WALL LEGEND Document Stage : CONSTRUCTION
CLEATS:
EXISTING INTERNAL STUD FRAMING UNDER EC - DENOTES ELONGATED CLEATS AT THIRD Project : 223315 Sheet No. S3.01
POINTS, REFER SECTION.
EXISTING REINFORCED MASONRY WALLS UNDER. Digital Ref : 223315 - STRUC Issue : 1
This document is copyright and shall not be copied without written
approval, nor shall it be used except for the development and the
site specified.
c:\12dS\data\12DSERVER\223315_2620\DWG Covey\Struc\Uncontrolled\223315 - STRUC.dwg Plot 08 Feb, 2023 - 08:34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Structural Engineering Drawings (Issue 1 - Dated 07-02-2023).pdfRelated documentApplication case desk ↗
About this file
- File size
- 360 KB (small file)
- File type
No other editions are linked here.