Referral Agency Response - Planning RAP25 0023 (As Published) · RAP25/0023
Bonds
6. A site compliance bond of $5,000 is to be submitted to Council prior to the
commencement of works. The commencement of works can only commence once
Council's Construction Engineering Officer has confirmation that the bond monies have
been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance
with these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
7. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for
performance and uncompleted works;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval
requirements have been met.
Earthworks
8. All earthworks and associated retaining structures/batters must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
9. Earthworks carried out on site must not affect the structural integrity of the revetment
wall, existing fences or other structures that border the subject site. Fences that are
affected must be replaced in a timely manner and in consultation and agreement of the
owners of the related properties.
Landscaping
10. Where excavations result in a cut face greater than 0.5m, suitable landscaping is to be
installed to soften the visual impacts of the excavations to the Noosa Waters’ Canal for
the full length of the cut face. Landscaping is to be of a suitable species and in
accordance with Noosa Plan 2020 Planning Scheme Policy PSP2 Landscaping.
Revetment Wall / Flood Storage
11. All works within the 4.5m setback from the revetment wall must be carried out generally
in accordance with:
a. SCG Consulting’s Existing & Proposed Site Plan (0447 – OW1.1, Rev. A) dated
24 April 2025.
12. All works for the purpose of increasing available flood storage must be located within
the 4.5m setback from the revetment wall.
Page 3 of 5
Document Set ID: 24491999
Version: 3, Version Date: 30/01/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP25 0023 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 117 KB (small file)
- File type
No other editions are linked here.