ORDINARY MEETING MINUTES 29 MAY 2014
Outdoor Lighting
20. Any outdoor lighting with the potential to affect surrounding residential premises shall
be designed, installed, operated and maintained in accordance with AS4282 "The
Control of the Obtrusive effects of Outdoor Lighting".
21. During operating hours, all parking areas, pedestrian areas and
entrances/exits to all stairwells, lifts and public toilets must be well lit with vandal
resistant lighting and with intensities to satisfy the requirements of Australian
Standard AS1158 “Public Lighting Code”. Lighting must be designed to reduce the
contrast between shadows and well lit areas.
Unitywater
22. Construction activities must not impede the access of Unitywater or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access
chambers).
23. The fire-fighting demand on Unitywater’s water supply system from the development
must not exceed 30 litres per second.
24. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Additional water meters must be installed for each title
of a community title or sub-lease scheme. Meters must be Unitywater approved,
installed in accordance with Unitywater requirements and remain accessible at all
times for reading and maintenance purposes.
25. Water meters must be located on alternative boundaries to electrical pillars.
26. The existing Unitywater sewer infrastructure must be relocated clear of the proposed
building works prior to commencement of excavation on site.
27. Written approval to enter and construct must be provided from property owners
through which external sewers or relocated sewers traverse. This must be submitted
with lodgment of the associated development application for Operational Works.
28. Easements of between 3 and 10 metres must be provided over all Unitywater sewers
located within property boundaries in accordance with the SEQ standards.
Easements shall be centred over the pipe. Easement terms shall be the most current
registered dealing held by the Department of Natural Resources & Mines and shall
not be altered or amended.
29. Buildings, basements and other structures must maintain a minimum clearance of 1.5
metres from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber
or sewer inspection opening. Any proposed or existing retaining wall crossing
Unitywater sewer mains must be self supporting for a minimum of 1.0 metre each
side of the sewer pipe and piered below the zone of influence of the sewer.
30. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
31. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature, and
suitable approved varieties.
32. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
This is not an official copy of Council’s Minutes
Page 8 of 21